Laserfiche WebLink
1_ _ <br /> . <br /> • <br /> ` Clt� o� ORONO , <br /> RESOLUTION OF THE CITY COUNCIL <br /> NO. 1616 <br /> • . <br /> � � • • <br /> Applicable <br /> Fee Code Section <br /> PAGE 4. APPEAL TO PLANNING COMMISSION � <br /> (Of Zoning Administrator Decision) $100 .00 32 . 120 <br /> PAGE 5. SURCHARGE FOR STAFF EXPENSE IN EXCESS 32 . 652 <br /> OF APPLICATION FEES <br /> Per fee schedule setforth below <br /> �Professional Time � $ 20/hour <br /> Clerical Time $ 10/hour <br /> Legal/engineering consultants Actual Billed Cost <br /> Mileage/Copies/Postage,etc. Actual Cost <br /> PAGE 7. DEMOLITION PERMIT . <br /> Principal Use $ 30 .00 � <br /> Accessory Use $ 20 .,00 <br /> • PLUMBING PERMIT . <br /> $ 2.00/Fixture Reset <br /> . 20 .040 (Ord 216) <br /> MECHANICAL PERMIT <br /> - furnace or. boiler with flue . $ 20 .00 each unit <br /> - wood stove with flue $ 30 .00 each unit <br /> - wood combination or add-on unit $ 50 . 00 each unit , <br /> - fireplace with flue - $ 30 .00 each unit <br /> - central air conditioning • $ 20 .00 each unit <br /> - exhaust fans (bath, kitchen, attic, etc) $ 5. 00 each location <br /> - solar space �.heatinc�equipment . $ 50 .00 each system <br /> - solar water heaters . $ 20 .00 each unit <br /> - repairs and replacement of the above �Same as above <br /> Commercial, Industrial & Mult-Family Residential by Unit Type <br /> - residential type equipment �. Per schedule above <br /> - furnace, boilers, unit heaters, & $ 4 .00 per 10, 000 btuh <br /> makeup air units . . output <br /> - central air conditioning $ 10 .00 per ton AC <br /> - exhaust fams • " $ 10 .00 each <br /> - refrigeration - • � $ 25.00 per compressor <br /> - fixed equipment with steam, hydraulic � <br /> or comp. air system • '� $ 2. 00 per connection <br /> • - fire sprinkler systems a) residential $ 40 .00 each project <br /> b) commercial $ 2.00/head minimum $20 . OG <br /> � ' ' project- Plan review 1/2 <br /> , . permit fee <br /> -2- <br />