Laserfiche WebLink
. <br /> I�C.WAI�D. <br /> ` WALL $YSTEMB Build Different. Build Better.� <br /> �" 4.6.2 Vertical Reinfarcement <br /> The placement and location of the vertical reinforcement within the Reward iForm is critical to <br /> the strength of the Reward walls. <br /> The most efficient method of placing vertical reinforcement consists of the following four steps. <br /> The vertical reinforcement is: i)cut to the proper length,2)placed between the staggered <br /> horizontal reinforcement,3)inserted into a drilled hole in the footing or slab or into a pvc ring <br /> placed over the vertical dowet in the footing or slab and 4)tied to the top horizontal rebar with <br /> wire or plastic ties after the last course is placed. <br /> An alternate method is to cut the vertical rebar into two or three equal lengths relative to the wali <br /> heighi. The lengths are cut so that an average person can lift the iForm over the vertical rebar. <br /> As the walls are being stacked,the vertical reinforcement is placed between the staggered <br /> horizontal rebar and tied,at the bottom to the vertical dowel and at the top to the horizontal rebar, <br /> with wire or plastic ties. <br /> A vertical steel reinforcement must be placed in each corner. <br /> Always extend the vertical rebaz 40 times the bar diameter beyond the first concrete pour if the <br /> watls will be continuing upward,or place a vertical lap bar into the first concrete pour. This will <br /> add structural integrity to the cold joint. <br /> ._. <br /> 11"iForm 13"iForm . _. �. <br /> _, . . <br /> Steet Reinforcement Placement Steel Reinforcement Placement <br /> Outside Inside Outside Inside �tside inside . Outside Inside <br /> bv�arorr exrovan ��:" . • •• ,w�eww � • .' <br /> �� o�F--c�ivlDt <br /> L1FIiI1ER ���� � <br /> Issued on:4/1/2d03 413 <br /> Release:E <br />