My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wall section specs - hse?garage?
Orono
>
Property Files
>
Street Address
>
C
>
Casco Point Road
>
2618 Casco Point Road - 20-117-23-24-0038
>
Land Use
>
Wall section specs - hse?garage?
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:55:30 PM
Creation date
3/9/2016 1:48:08 PM
Metadata
Fields
Template:
x Address Old
House Number
2618
Street Name
Casco Point
Street Type
Road
Address
2618 Casco Point Road
Document Type
Land Use
PIN
2011723240038
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> I�C.WAI�D. <br /> ` WALL $YSTEMB Build Different. Build Better.� <br /> �" 4.6.2 Vertical Reinfarcement <br /> The placement and location of the vertical reinforcement within the Reward iForm is critical to <br /> the strength of the Reward walls. <br /> The most efficient method of placing vertical reinforcement consists of the following four steps. <br /> The vertical reinforcement is: i)cut to the proper length,2)placed between the staggered <br /> horizontal reinforcement,3)inserted into a drilled hole in the footing or slab or into a pvc ring <br /> placed over the vertical dowet in the footing or slab and 4)tied to the top horizontal rebar with <br /> wire or plastic ties after the last course is placed. <br /> An alternate method is to cut the vertical rebar into two or three equal lengths relative to the wali <br /> heighi. The lengths are cut so that an average person can lift the iForm over the vertical rebar. <br /> As the walls are being stacked,the vertical reinforcement is placed between the staggered <br /> horizontal rebar and tied,at the bottom to the vertical dowel and at the top to the horizontal rebar, <br /> with wire or plastic ties. <br /> A vertical steel reinforcement must be placed in each corner. <br /> Always extend the vertical rebaz 40 times the bar diameter beyond the first concrete pour if the <br /> watls will be continuing upward,or place a vertical lap bar into the first concrete pour. This will <br /> add structural integrity to the cold joint. <br /> ._. <br /> 11"iForm 13"iForm . _. �. <br /> _, . . <br /> Steet Reinforcement Placement Steel Reinforcement Placement <br /> Outside Inside Outside Inside �tside inside . Outside Inside <br /> bv�arorr exrovan ��:" . • •• ,w�eww � • .' <br /> �� o�F--c�ivlDt <br /> L1FIiI1ER ���� � <br /> Issued on:4/1/2d03 413 <br /> Release:E <br />
The URL can be used to link to this page
Your browser does not support the video tag.