<br /> • Omega Products International, Inc., One Coat 6.3.1 Manufactured by Airlite Plastics Company,Omaha,
<br /> Stucco, Omega Diamond Wall as described in NE, OPL Document No. 15622-1, Revision e, May
<br /> SBCCI PST&ESI Evaluation Report#2221. 2002.
<br /> 6.3.2 Manufactured byTuscarora,Inc.,NewBrighton,PA,
<br /> 4.6.1.2 Brick Veneer- Exterior Finish: The brick veneer OPL Document No.16029-1,Revision b,May 2002.
<br /> shall be installed in accordance with the applicable Code. 6.3.3 Manufactured by Tuscarora,Inc.,Colorado Springs,
<br /> CO, OPL Document No. 16217-1, Revision b,May
<br /> 4.6.1.3 Stucco Veneer-Exterior Finish:The stucco shall 2002.
<br /> be a minimum 7/8 inch(22 mm)thick and shall be installed in 6.3.4 Manufactured by Tri State Foam Products, Inc.,
<br /> accordance with the applicable Code. Ridgeway, VA, OPL Document No. 16406-1,
<br /> Revision a, May 2002.
<br /> 4.6.1.4 Interior Finish: The forms shall be finished on the
<br /> interior with an approved 15 minute thermal barrier such as'/z 6.4 Surface burning characteristics testing under ASTM
<br /> inch (12.7 mm) thick gypsum wallboard as required by the E 84 of EPS bead suppiiers is covered under NER-
<br /> applicable Code.The gypsum wallboard shall be installed and 236, NOVA Chemicals, Inc.; NER-479, BASF
<br /> attached as described in Section 4.1 above. Corporation; NER-384 and SBCCI PST & ESI
<br /> #9498,Huntsman Chemical Corporation;NER-238,
<br /> 4.6.1.5 Fireblocking: Foam plastic on the interior shall be Styrochem International, Inc.
<br /> fireblocked at ceilings and floors using materials specified by 6.5 Engineering analysis and testing for pour rates,
<br /> the applicable Code.
<br /> Alpha-Omega Geotech, Inc., August 23, 1996,
<br /> 4.6.2 One Story Buildings: The following conditions signed by Roy J. Leonard, Ph.D., P.E.
<br /> app�Y� 6.6 Pull tests on fasteners attached to plastic strips,
<br /> 4.6.2.1 The building is equipped throughout with an Alpha-Omega Geotech, Inc., September 6, 1996,
<br /> automatic sprinkler system in accordance with the applicable signed by Roy J. Leonard, Ph.D., P.E.
<br /> Code. 6.7 Test reports on crawl space fire testing of EPS,
<br /> 4.6.2.2 The exterior of the foam wall is covered with metal of Southwest Research Institute,
<br /> 6.7.1 BASF Corporation,SwRI Project No.01-788-205[2],
<br /> a thickness of not less than 0.032 inch(0.81 mm),aluminum Revised February 1996,signed by Joseph P. Dylla
<br /> or corrosion-resistant steel having a base metal thickness of and Alex B.Wenzel.
<br /> 0.0160 inch(0.41 mm). 6.7.2 Nova chemicals, Inc., (formerly ARCO Chemical
<br /> 4.6.2.3 Interior Finish: The forms shall be finished on the Co.) SwRI Project No. 01-2602-207, April 1989,
<br /> interior with an a roved 15 minute thermal barrier such as'/z signed by Alex B. Wenzel.
<br /> PP 6.7.3 Huntsman chemical corporation, SwRI Project No.
<br /> inch (12.7 mm) thick gypsum wallboard as required by the 01-7522-405, June 1996, signed by Charles c.
<br /> applicable Code.The gypsum wallboard shall be installed and Bailey and Alex B.Wenzel.
<br /> attached as described in Section 4.1 above.
<br /> 4.6.2.4 Fireblocking: Foam plastic on the interior shall be 6.8 Engineering calculations, Reward Wall Systems,
<br /> fireblocked at ceilings and floors using materials specified by December 7,1999,prepared by,signed,and sealed
<br /> by Karen A. Bexton,P.E.,SE. Detailed engineering
<br /> the applicable Code. calculations for prescriptive steel reinforcement
<br /> 4.7 Special Inspections tables for Reward eFORMS as shown in Technical
<br /> Manual (item 6.2 referenced above), Tadros
<br /> Special inspection is required as noted in Chapter 17 of the Associates, LLC, signed and sealed by Karen A.
<br /> applicable Code, for placement of reinforcing steel and Bexton, P.E.,S.E.,2/7/01.
<br /> concrete, concrete cylinder testing, form installation and 6.9 Test report on fire restive wall assemblies under
<br /> bracing, and concrete operations. Special inspectors shall ASTM E 119, Omega Point Laboratories Inc.:
<br /> comply with the applicable Code. 6.9.1 Three Hour wall assembly, Project No. 15622-
<br /> 5.0 IDENTIFICATION 100710, July 7, 1997, signed by Herbert W.
<br /> Stansberry II and William E. Fitch, P.E.
<br /> Each pallet of Reward Wall Systems0 forms covered by this 6.9.2 Four hour walf assembly, Project No. 15622-
<br /> report shall be labeled with the manufacturer's name and/or 101883, July 12, 1999, signed by Michael E. Dey
<br /> trademark,the third party agencies name and/or trademark and William E. Fitch, P.E.
<br /> (Omega Point Laboratories NER-QA337) and this ICC-ES 6.9.3 Two Hour, letter report, Project No. 15622-100710,
<br /> Legacy report number NER-604 for field identification. March 19, 1999, signed by John D. Nicholas.
<br /> 6.9.4 Letter report, clarification of 2 and 4 hour wall
<br /> 6.0 EVIDENCE SUBMITTED assembly testing,April 20,2000,signed by Deggary
<br /> N. Priest, President, Omega Point Laboratories.
<br /> 6.1 Manufacturer's descriptive literature,specifications, 6.9.5 Letter report,engineering evaluation of 9 inch thick
<br /> installation instructions,and Training Program. iForm with 4 inch thick concrete core, March 19,
<br /> 2002. Signed by Tim M. Mattox.
<br /> 6.2 Reward Wall Systems0,Inc.,Installation,Structural 6.9.6 Letter report,engineering evaluation of 9 inch iForm
<br /> and Technical Manual for Reward Walls, Issued with 4 inch concrete core load-bearing assembly,
<br /> January 1, 2000. Includes structural design April 3,2002, signed by Tim M. Mattox.
<br /> procedure and tables, signed and sealed by Karen
<br /> A. Bexten, P.E.,SE, December 7, 1999. 6.10 Test report surface burning characteristics under
<br /> ASTM E 84 of Reward forms cut in half, Omega
<br /> 6.3 EPS Quality Manuals prepared by Omega Point Point Laboratories Inc., Report No. 15622-102084,
<br /> Laboratories for Reward Wall Systems forms: December 4, 1997, signed by Ernst L.Schmidt and