Laserfiche WebLink
drainage on the property. Additionally, the applicant may want to consider installing some measures to slow or <br /> � reduce the amount of water being directed down the property lines. By channelizing the runoff there is a <br /> potential of additional erosion on the slope. <br /> Jesse Struve, PE <br /> Director of Public Works/City Engineer <br /> City of Orono <br /> (952) 249-4661- Direct <br /> (952) 249-4616- Fax <br /> www.ci.orono.mn.us <br /> z <br />