My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-2016 Council Packet
Orono
>
City Council
>
2016
>
02-22-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 11:09:01 AM
Creation date
2/25/2016 11:05:23 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br /> <br /> <br />a. The City Council authorize Bolton and Menk to begin engineering and design upon receipt of an <br />escrow from the Eisinger developer in the amount of $47,369 which is equal to the proportion of the <br />engineering fees attributable to that development using the same proportions outlined in the Resolution <br />6530 for the entire project. <br /> <br />b. Upon Final Plat for the Eisinger Development the City Council would consider authorizing staff <br />to solicit bids for the construction of the sewer and water extensions. <br /> <br />COUNCIL ACTION REQUESTED: Consider a motion to approve engineering proposal from Bolton <br />and Menk of not to exceed $149,500 to commence upon the receipt of an escrow from Lake West LLC in <br />the amount of $47,369 for the design and engineering of the sewer and water main extensions along <br />CSAH112/Wayzata Blvd.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.