Laserfiche WebLink
of excess dirt, re-installation of pipe drain, tree removal (one), and <br /> re-sodding of the yard, including the backyard and side of the house <br /> where equipment will presumably enter. I would note that many of these <br /> items were discussed last year, so there is little incremental to what <br /> was proposed a year or so ago. We will not sign off on this work until <br /> a conceptual drawing has been completed showing elevation changes <br /> through the proposed re-graded area. <br /> In exchange for the city's acceptance of the above, we are willing to <br /> allow Orono to have a maintenance and utility easement for the purpose <br /> of maintaining and fixing problems with the pipe that runs through the <br /> yard and agree to sign paperwork that will be needed for such as well as <br /> what would be needed for the City and Bonestroo to enter the property <br /> and begin work. <br /> As mentioned below, much - if not all -of the work proposed above is in <br /> a different part of the yard than the proposed new deck and fireplace, <br /> therefore I would appreciate the work permits being accelerated and <br /> given to Outdoor Excapes. If there is additional data or information <br /> needed for the permits, please explain what is missing as soon as <br /> possible. In the event we cannot agree on the above compromise in the <br /> next day or so and/or no explanation is given for missing data in the <br /> permit requests, the next step would be for me to hire a lawyer to <br /> determine why the City of Orono is delaying a valid permit request, <br /> which would be regrettable. <br /> Best regards, <br /> Jeff Davies, CFA <br /> Waterstone Capital Management, L.P. <br /> 2 Carlson Parkway, Suite 260 <br /> Plymouth, MN 55447 <br /> Direct: 952.697.4109 <br /> Fax: 952.697.4130 <br /> Cell: 704.577.0593 <br /> jdavies@wscm.net <br /> -----Original Message----- <br /> From: "Hans Frees" <HFrees@outdoorexcapes.com> <br /> Date: Tue, 11 May 2010 09:37:42 <br /> To: <mcurtis@ci.orono.mn.us> <br /> Cc: <jdavies.mn@gmail.com>; Aaron Lutz<ALutz@outdoorexcapes.com>; <br /> <tkellogg@bonestroo.com>; <darren.amundsen@bonestroo.com>; Ward, Jared <br /> T<Jared.Ward@bonestroo.com> <br /> Subject: FW: Following Up <br /> Melanie, Kresta Davies and I meet Jared on site yesterday to discuss the <br /> grading. We are all in agreement on what needs to be done. Jared did <br /> confirm to both Jeff Davies and I that Bonestroo has everything they <br /> need for the building permits to be released. I also discussed and <br /> layed out the proposed new landscape work with Jared on site. He is in <br /> agreement that the needed retaining walls are able to be installed after <br /> the fact along with the grading work. Neither the construction of the <br /> fireplace or the deck have any impact on the re-grading work. I told <br /> Jared I would get him/the city an estimate for the proposed work as <br /> soon as our building permits are released. Please let me know when I <br /> can pick up these permits. I hope you understand and see the <br /> willingness we are putting forward to expedite this for the Davies. I'd <br /> appreciate hearing back from you. <br /> 3 <br />