Laserfiche WebLink
BARBOUR/LADOUCEUR ARCHITECTS, PA. <br /> WiTH DWELL PARTNERS, LLC <br /> MILLER-ARTEMIUK HOME <br /> NEW CONSTRUCTION <br /> ORorvo, MN <br /> 4) Use the materials of the same manufacturer for each system unless approved by the Owner. <br /> 5) Only solvents recommended by the paint manufacturer shall be used. Do not thin or othervvise <br /> modify any material except at the manufacturer's direction. <br /> 6) Deliver materials in the original containers, with seals unbroken and labels intact. <br /> 7) Subcontractor shall examine the surfaces to be finished prior to commencing work. If woodwork, <br /> metal, or any other surfaces to be finished cannot be put in proper condition for finisher by customary <br /> cleaning, sanding, and puttying operations, notify the Contractor in writing or assume responsibility <br /> for and rectify any unsatisfactory finish resulting. <br /> 8) The workmanship shall be of the very best, employing only skilled mechanics. Spread the materials <br /> on in even, thorough coats without runs, sags, or other blemishes. <br /> 9) Surfaces to be painted shall be cleaned and free of loose dirt and dust before painting is started. <br /> 10) Necessary puttying of nail holes and cracks shall be done after the first coat with putty of color to <br /> match that of the finish. <br /> 11) Metal surfaces shall first be washed with mineral spirits to remove any dirt or grease before applying <br /> materials. Where rust or scale is present, it shall be wire brushed or sandpaper clean before <br /> painting. <br /> 12) Coats shall be thoroughly dry before applying succeeding coats. <br /> 13) Surfaces of millwork shall be back primed before installation. <br /> 14) Tops, bottoms, and edges of doors shall be finished to match the faces after they have been fitted by <br /> carpenter. <br /> 15) Doors shall be prepared for hardware, fitted into the frame, and undercut by the carpenter prior to <br /> any finishing (paint, seal, or varnish) by the painter. <br /> 16) Exterior painting shall not be done while the surface is damp or during rainy or frosty weather. <br /> 17) Discard containers as they are emptied. Reuse is prohibited. <br /> 18) Store materials in one place where directed. Protect walls and floors of storage rooms. Remove <br /> from the building every night oily rags and waste. <br /> 19) Protect own work as well as adjacent work and materials by covering during process of work. <br /> Remove paint and varnish spots form floors, glass, and other surfaces when work is completed. <br /> Remove rubbish and accumulated materials, leaving premises in a clean and orderly condition. <br /> 20) Items to be included with those noted on the Drawings or Specification, but not limited to are: <br /> a) All gypsum board walls. <br /> b) Exposed structural and miscellaneous metals. <br /> c) Exposed piping. <br /> d) Siding and trim. <br /> e) Hardwood flooring and stairs. <br /> 21) Seal or apply finish to surfaces, exposed or concealed, backs and edges of wood items to receive a <br /> finish that include, but are not limited to: wood window stools and trim. Sealers shall be applied <br /> before items are installed. <br /> 129 N. SECOND STREET SUITE 103 MINNEAPO�is MN 55401 <br /> 612 339 5093 (PH) 612 339 0499 (FAX) WWW.BAR-LAD-ARCH.COM <br /> Specifications-8 <br />