Laserfiche WebLink
, ' RRETR�ATMENT WORK SHEET A•1 Estimated Sewage Flows in GPD <br /> 1. FLOW Bedrooms Class I Class il Class III Class IV <br /> A. Estimated 300 gpd(see figure A-1) 2 300 225 180 60%of <br /> � measured x 1.5(safet factor= 0 gpd 3 450 300 218 the <br /> B. SEPTIC TANK CAPACITY 2,000 gallons(see figure C-1) 4 600 375 256 values <br /> a �5u 4ou �y4 in cne <br /> 1 2. SOILS(Site evaluation data) 6 900 525 332 Class I, <br /> C. Depth to restrictin la er= 24"-35" feet 7 1050 600 370 II or II <br /> D. Texture LoamlCla Loam Percolation rate 28.2 MPI 8 1200 675 408 columns <br /> E. SSF 1.67 ftZlgpd(see downsizing or<3ff figure) <br /> � F. Land Slope 10 to 12 % C-1 Se tic Tank Ca aci in Gallons <br /> Number of Minimum Capacity with Capacity with <br /> 3. Pressure Distribution Trench Bottom Area Bedrooms Ca acit Garb.Disp. Disp.and Lift <br /> H. For trenches with 6"of rock below the pipe,Area=Flow(1A)divided by SSF(2E)= 2 or less 750 1125 1500 <br /> ' 300 gpd x 1.67 ft2lgpd= 501.0 ft2 3 or 4 1000 1500 2000 <br /> I. For trenches with 12"of rock below the pipe,Area=Flow(1A)divided by SSF(2E)x 0.8 5 or 6 1500 2250 3000 <br /> 300 gpd x 1.67 ftZlgpd x 0.8 = 400.8 ft2 7,8 or 9 2000 3000 4000 <br /> � 4. ORGANIC LOADING(if pretreatment is being used) <br /> J. 1. Organic loading=flow(A)x estimated BOD in mglL leaving the Downsizing Chart with 3 ft of Separation <br /> pretreatment unit x 8.35 I 1,000,000 Soil Characterisitcs,SSF 8 Or anic Loadin <br /> � 300 gpd x 10 mglL x 8.35 I 1,000,000= 0.02505 Ibs BOD Perc Rate Soil Tecture SSF Organic Ld <br /> 2. System loading=organic loadin J1 I area(H or I) mpi s ft/ d Ibslda Ift <br /> 0.02505 Ibs BOD I 401.0 ft2 = 6E-05 <0.1 Coarse sand 0.83 0.0020 <br /> , 3. Check system loading rate on chart. Should be less than value. 0.1-5 Medium sand 0.83 0.0015 <br /> Loam sand <br /> 5. ROCK VOLUME 0.1-5 Fine sand 0.83 0.0012 <br /> K. Rock depth below distribution pipe plus 0.5 foot times bottom area: 6-15 Sand loam 0.83 0.0011 <br /> � _(Rock depth+0.5 foot x Area(H,or I) - 16-30 Loam 0.83 0.0010 <br /> (�ft+0.5 ft)x � ftZ 0 ft3 31-45 Silt loam,silt 1.00 0.0007 <br /> L. Volume in cubic yards=volume in cubic feet divided by 27 46-60 Clay loam, 1.10 0.0006 <br /> K I 27=cubic yards 0 I 27= 0 yd3 sandy clay <br /> , M. Weight of rock in tons=cubic yards times 1.4 or silt cla <br /> L x 1.4=tons 0 x 1.4= 0 tons 61 -120 Clay,sandy 2.50 0.0005 <br /> . or silt cla <br /> , 6. SYSTEM LENGTH >120 Cla 3.25 0.0003 <br /> N. Select width= �3 ft <br /> 0. Divide bottom area b width: H,I)divided by N=lineal feet Sizing Chart with<3 ft of Separation <br /> 401.0 ftZ I 3 ft = 134 lineal feet Soil Characterisitcs 8 SSF <br /> ' Perc Rate Soil Tecture SSF <br /> an oam <br /> 7. SYSTEM LlR 16-30 Loam 1.67 <br /> P, Draw a line downhill though soil treatment system drawn in layout. 31-45 Silt loam,silt 2.00 <br /> � How many trenches does it cross? Add their widths together. 46-60 Clay loam, 2.20 <br /> width 1 +width 2+width 3+...... sandy clay <br /> �3 ft + �3 ft + 03 ft + ft = 9 ft or silt cla <br /> Q. Divide total trench width(P)by SSF(F)=gallons per foot 61-120 Clay,sandy 4.00 <br /> � 9 ft I 1.67 ft2lgpd = 5.4 gallft(Should be<12 gallons per loot) or silt cla <br /> >120 Cla 5 <br /> ' <br /> , <br /> ' <br /> � <br /> Page 1 of 1 <br /> ' <br />