My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: Brown Rd project
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road South
>
445 Brown Road South - PID: 03-117-23-31-0001
>
Correspondence
>
Re: Brown Rd project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:12 PM
Creation date
2/4/2016 12:10:29 PM
Metadata
Fields
Template:
x Address Old
House Number
445
Street Name
Brown
Street Type
Road
Street Direction
South
Address
445 Brown Rd S
Document Type
Correspondence
PIN
0311723310001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BROWN ROAD PROJECT <br /> Steps 2-3: <br /> 1. Tear down all existing buildings; remove all remaining debris from property and to <br /> remove all stumps (32). <br /> 2. Survey Property: Reason for splitting property is so that we can tackle it in sections, <br /> making it more manageable, and because each section will have its own issues and <br /> costs associated. Each lot will also need different remedy actions. For example one <br /> may check out perfect from day 1, one may need some ground water monitoring <br /> wells to verify that its clean and another may need some debris hauled out. <br /> A. Identifying Well and Septic Locations on two of the three sites initially, stating <br /> the 3`d site as an out lot. <br /> Reasons for splitting the property: <br /> A. Much like any complex problem I have to dissect it in pieces making it <br /> manageable. <br /> B. One ar two of the lots will likely be deemed "clean" sooner than the other (s), in <br /> which case we will be able to receive the no association and no further action <br /> letters on that lot (s) sooner rather than receiving both later. <br /> C. In turn this allows us to build out there sooner rather than later. <br /> - It is likely that the MPCA will grant these letters simultaneously per lot but that each <br /> lot will be deemed complete at different times over the next two years. <br /> - My gut is telling me that they will deem one ar two lots clean within the first year and <br /> it will take 2plus years far them to deem the third clean. <br /> What I mean by being granted building sites: <br /> 4. To be granted building sites <br /> A. Lot 1 - Carriage House site <br /> B. Lot 2 - Future Main Home site <br /> o I would move my mother ar mother in law into the carriage house as they age, <br /> I would move my wife, I and children into the Future Main Home. <br /> C. Lot 3 — Leave Natural as a small Nature Preserve /Possible Homesite if MPCA <br /> deems clean up has been completed to allow for this. <br /> o This lot will take the longest as this is the location of the old dump. <br /> o I am ok with leaving it completely untouched as a park like setting/mini <br /> nature preserve planting mosses, grasses, wildflowers, fruit trees and also <br /> cover for wildlife. I will likely hang duck houses and also a nesting pad or <br /> two in the pond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.