Laserfiche WebLink
BROWN ROAD PROJECT <br /> Steps 2-3: <br /> 1. Tear down all existing buildings; remove all remaining debris from property and to <br /> remove all stumps (32). <br /> 2. Survey Property: Reason for splitting property is so that we can tackle it in sections, <br /> making it more manageable, and because each section will have its own issues and <br /> costs associated. Each lot will also need different remedy actions. For example one <br /> may check out perfect from day 1, one may need some ground water monitoring <br /> wells to verify that its clean and another may need some debris hauled out. <br /> A. Identifying Well and Septic Locations on two of the three sites initially, stating <br /> the 3`d site as an out lot. <br /> Reasons for splitting the property: <br /> A. Much like any complex problem I have to dissect it in pieces making it <br /> manageable. <br /> B. One ar two of the lots will likely be deemed "clean" sooner than the other (s), in <br /> which case we will be able to receive the no association and no further action <br /> letters on that lot (s) sooner rather than receiving both later. <br /> C. In turn this allows us to build out there sooner rather than later. <br /> - It is likely that the MPCA will grant these letters simultaneously per lot but that each <br /> lot will be deemed complete at different times over the next two years. <br /> - My gut is telling me that they will deem one ar two lots clean within the first year and <br /> it will take 2plus years far them to deem the third clean. <br /> What I mean by being granted building sites: <br /> 4. To be granted building sites <br /> A. Lot 1 - Carriage House site <br /> B. Lot 2 - Future Main Home site <br /> o I would move my mother ar mother in law into the carriage house as they age, <br /> I would move my wife, I and children into the Future Main Home. <br /> C. Lot 3 — Leave Natural as a small Nature Preserve /Possible Homesite if MPCA <br /> deems clean up has been completed to allow for this. <br /> o This lot will take the longest as this is the location of the old dump. <br /> o I am ok with leaving it completely untouched as a park like setting/mini <br /> nature preserve planting mosses, grasses, wildflowers, fruit trees and also <br /> cover for wildlife. I will likely hang duck houses and also a nesting pad or <br /> two in the pond. <br />