Laserfiche WebLink
J. Make arrangements with the local gas supplier for provision of natural gas to the site and building. Verify <br /> exact location of ineter and provide shut-off valve at first accessible point within the building. Coordinate fuel <br /> requirements at all equipment and appliances. <br /> 633 SPECIFICATIONS <br /> Page 69 <br />