15410 Plumbing <br /> B. Provide materials for, and install the plumbing and fuel systems as shown on the Drawings, specified herein, <br /> as may be required for a complete installation: <br /> 1. Materials, not specified herein, and installed as work of this Section are by allowance — refer to Section <br /> 15420 PLUMBING FIXTURES. <br /> 2. Portion of the work of this Section is by Altemate Bid — Refer to Section 00420 LIST OF ALTERNATE <br /> BIDS: <br /> a. Base Bid at the Lower Level: Complete interior build-out of Exercise Room and Bath No. 4 and <br /> plumbing rough-ins at remainder of the Work <br /> b. Alternate Bid: Add plumbing fixtures at Bath No. 5 <br /> c. Alternate Bid: Add sink at Kitchenette. <br /> C. Some plumbing work is by other specialty subcontractors: <br /> 1. Well .............................Section 02563 Water Well <br /> 2. Septic...........................Section 02575 Septic Tank System <br /> 3. Landscape Irrigation.....Separate contract by the Owner <br /> 4. Drain Tile .....................Section 02612 Foundation Drainage System <br /> 5. Water Conditioning.......Section 15430 Water Softening System <br /> 6. Water Purification.........Section 15440 Water Filtration System. <br /> D. Plumbing Materials: <br /> 1. 8elow-Grade Sanitary; Vent and Waste: <br /> 2. Above-Grade Sanitary; Vent and Waste: <br /> 3. Be/ow-Grade Domestic Water: <br /> 4. Above-Grade Domestic Water. <br /> 5. Natural Gas: <br /> 6. Lead-containing pipe, solder, flux, etc. will not be permitted on the Project. <br /> E. Coordinate work with Well Subcontractor: <br /> 1. Provide water supply line to 5'-0" outside of foundation wall — remainder of water line by Well <br /> Subcontractor. <br /> 2. Install water meter if requested by the Owner. Install meter separated from water supply to landscape <br /> irrigation. <br /> 3. Provide rough-in to and from pressure tank and as required by the Well Subcontractor. <br /> F. Coordinate work with the Septic Subcontractor: <br /> 1. Provide waste line to 5'-0" outside of foundation wall—remainder of waste line by Septic Subcontractor. <br /> 2. Provide rough-in for pump if required for septic system design. <br /> G. Coordinate work with the Landscape Subcontractor. Rough-in water supply line to system controls, and <br /> continue to 5'-0" outside of foundation wall— remainder of irrigation lines by the Landscape Subcontractor. <br /> H. Coordinate work with Concrete Subcontractor: Provide pump, controls and discharge for sump basin instailed <br /> by the Concrete Subcontractor. <br /> I. Provide sanitary, venting and domestic water piping, and make all connections required for fixtures shown on <br /> the Drawings: <br /> 1. Verify all invert elevations in relation to floor elevations and site conditions. <br /> 2. Install water service with minimum 7'-0" earth cover. Provide back-flow prevention. <br /> 3. Provide 3/4 inch water supply lines to whirlpool in Master Bath, for fast filt. <br /> 4. Install domestic hot water loop and pump for fast delivery of hot water. <br /> 5. Coordinate access requirements for equipment, shut-off/balance valves, cleanouts, etc. with the General <br /> Contractor. <br /> 6. Caulk all fixtures with approved sealant. <br /> 633 SPECIFICATIONS <br /> Page 68 <br />