My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction specifications
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road North
>
809 Brown Road North - 27-118-23-34-0006
>
Permits/Inspections
>
Construction specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:21:21 PM
Creation date
1/26/2016 1:59:46 PM
Metadata
Fields
Template:
x Address Old
House Number
809
Street Name
Brown
Street Type
Road
Street Direction
North
Address
809 Brown Road North
Document Type
Permits/Inspections
PIN
2711823340006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08800 Glazing <br /> A. Provide and install all interior glazing and related materials as shown on the Drawings and specified herein: <br /> 1. Work of this Section is by allowance — materials and glazing schedule specified herein are for bidding <br /> purposes only. <br /> B. Glass and Glazing Materials: <br /> 1. Tempered Glass: ANSI Z97.1 and ASTM C 1048. Provide where shown on the Drawings, specified <br /> herein, or as may be required by building codes. <br /> 2. Mirrors: Fed. Spec. DD-G-451 for 1/4 inch mirror glazing; coating of pure silver without pinholes or other <br /> defects visible to the naked eye; and coated with mirror backing paints of uniform and adequate <br /> thickness. <br /> 3. Shower poor/Enclosure Hardware: Frameless, bright chromium plated; or powder-coated "White"; as <br /> specified herein. <br /> 4. Glazing Sealant: One-component, silicone, or as recommended by the glass supplier. <br /> 5. Glazing Tape: Compatible with glazing sealant, and as recommended by the glass supplier: <br /> 6. Setting Blocks and Shims: EPDM or neoprene; sizes required for loads and Project conditions. <br /> C. Glazing Schedule: <br /> 1. Mirrors: <br /> a. <br /> b. <br /> 2. Shower poors/Enclosures: <br /> a. <br /> b. <br /> 3. Firep/ace Doors: Great Room masonry�replace <br /> � <br /> 633 SPECIFICATIONS <br /> Page 52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.