My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction specifications
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road North
>
809 Brown Road North - 27-118-23-34-0006
>
Permits/Inspections
>
Construction specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:21:21 PM
Creation date
1/26/2016 1:59:46 PM
Metadata
Fields
Template:
x Address Old
House Number
809
Street Name
Brown
Street Type
Road
Street Direction
North
Address
809 Brown Road North
Document Type
Permits/Inspections
PIN
2711823340006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06221 Interior Finish Carpentry Labor <br /> A. Perform all finish carpentry work at the interior of the building, as shown on the Drawings and specified <br /> herein: <br /> 1. Installation of: <br /> a. Inte�ior doors and frames <br /> b. Millwork and trim <br /> c. Decorative timber trusses, fireplace mantel and wood ceiling <br /> d. Rough workbench and storage shelving <br /> e. Wood stair parts and trim <br /> f. Omamental columns <br /> g. Interior and e�erior door hardware <br /> h. Toilet and bath accessories. <br /> B. Provision of materials for interior finish carpentry is work of other sections of the Technical Sections: <br /> 1. Section 05500 METAL FABRICATION MATERIALS <br /> 2. Section 06220 INTERIOR FINISH CARPENTRY MATERIALS <br /> 3. Section 08050 DOORS AND FRAMES <br /> 4. Section 08710 DOOR AND CASEWORK HARDWARE. <br /> C. Install interior doors, frames, millwork and trim as shown on the Drawings. <br /> D. Install and prefit hardware to doors and frames prior to application of field finish. <br /> E. Assemble and install decorative wood timber trusses. Coordinate same with Rough Carpenter to provide <br /> adequate bearing and points of anchorage. <br /> F. Install T&G wood panel ceiling, face-nailed at perimeter and only where required. Blind-nail through tongue <br /> into roof framing. <br /> G. Construct and install rough workbench and storage shelving in Garage. Assemble with screws. Verify layout, <br /> size and location with the Architect. <br /> H. Install wood stair treads and risers to have profile in compliance with applicable building codes. Glue and <br /> screw treads and risers to stringers. <br /> I. Install ornamental columns in strict accordance with manufacturer's recommendations. <br /> J. Door Hardware: <br /> 1. Verify all installation heights to comply with the standard door hardware specifications. Verify special <br /> conditions with the Architect prior to door or frame preparation. <br /> 2. Following installation, inspect hardware and doors for proper fit and function. <br /> � <br /> 633 SPECIFICATIONS <br /> Page 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.