My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01021 (septic)
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4495 Bayside Road - 06-117-23-21-0004
>
Septic
>
2012-01021 (septic)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:24:26 PM
Creation date
1/22/2016 3:39:54 PM
Metadata
Fields
Template:
x Address Old
House Number
4495
Street Name
Bayside
Street Type
Road
Address
4495 Bayside Rd
Document Type
Septic
PIN
0611723210004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Mound Materials Worksheet uNI�ERSITY \ <br /> Minnesota Pollution OF MINNESOTA �^ '�"""' <br /> Controi Agency l�-�-� <br /> ProjectlD: v 11.09.22 <br /> A• Calculate Bed (rock)Volume:Bed Length (2.0 X Bed Width 2.B)X Depth =Volume (ft') <br /> 63.0 ft x 10.0 ft x �.o = 630.0 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic ards: <br /> 630.0 ft' : z7 = 23.3 yd3 <br /> Add 20%for constructability: 23.3 yd'X 1.2 = 28.0 yd3 <br /> B. Calculate Clean Sond Vo(ume: <br /> Volume Under Rock bed:Average Sand Depth x Medio Width x Media Length =cubic feet <br /> 1.8 ft x 10.0 ft x 63.0 ft = 1113.0 ft' <br /> For a Mound on a slope from 0-1% <br /> Volume from Length=((Upslope Mound Height-t)X Absorption Width Beyond Bed X Media Bed Length) <br /> ft -1) X X ft = <br /> Volume from Width=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> ft -1) X X ft = <br /> Total Clean Sand Vo(ume: Vo(ume from Length+Vo(ume from Width+Vofume Under Medio <br /> ft3 + ft3 + �� ft3 - ft3 <br /> For a Mound on a slope greater than 1% <br /> Upslope Vo(ume:((Upslope Mound Height - 1)x 3 x Bed Length)=2=cubic feet <br /> (( 3.2 ft -�) x 3.o ft x 63.0 )=2= 204.8 ft' <br /> Downslope Volume:((Downsfope Heisht- i) x Downslope Absorption Width x Media Length)=2=cubic feet <br /> (( 4.4 ft-1) x 10.�ft X 63.0 )=2= 1060.5 ft' <br /> Endslope Volume:(Downs(ope Mound Height- 1) x 3 x Media Width =cubic feet <br /> ( 4.4 ft-1 ) x 3.o ft x 10.0 ft = 101.0 ft' <br /> Tota!Clean Sand Volume:Ups(ope Volume +Downslope Volume +Endslope Volume +Vo(ume Under Media <br /> 204.8 ft' + 1060.5 ft' • 101.0 ft3 . 1113.0 ft'= 2479.3 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 2479.3 ft' : 27 = 91.8 yd' <br /> Add 20%for constructability: 91.8 yd'X 1.2 = 110.2 yd3 <br /> C. Calculate Sondy Berm Volume: <br /> Tota!Berm Volume(approx):((Avg.Mound Height-0.5 ft topsoil)x Mound Width x Mound Length)*2=cubic feet <br /> ( 3.8 _ 0.5 )ft x 38.0 ft x 89.0 )=z= 5523.7 ft' <br /> Total Mound Vo(ume-Clean Sand volume-Rock Volume=cubic feet <br /> 5523.7 ft' - 2479.3 ft' - 630.0 ft' = 2414.4 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 2414.4 fc' : 27 = $9,4 yd' <br /> Add 20%for constructabitity: 89.4 yd' x 1_2 = 107.3 yd' <br /> D. Calculate Topsoi(Moterial Volume:Total Mound Width X Total Mound Length X.5 ft <br /> 38.0 ft X 89.0 ft x o.5 ft = 1690.9 ft' <br /> Divide ft'by 27 ft'tyd3 to calculate cubic yards: 1690.9 ft' : 27 = 62.6 yd' <br /> Add 20%for construdability: 62.6 yd' x 1.2 = 75,2 yd' <br />
The URL can be used to link to this page
Your browser does not support the video tag.