Laserfiche WebLink
, , _ <br /> __ - -_- — -__ _ _ _ _.— <br /> RHVAC-Residential HVAC Load Calculations :, Elite Software Development,Inc. <br /> Flare Heating &���/C Inc. .�' Rambler Townhome Duplex(Cascade) <br /> Golden�✓alley MN 55427-3700 - Page 1 <br /> __ _--- --- ---- <br /> , .-. -- _ _ <br /> .�- -„- <br /> '�r�E.;� �e,�ort --- - <br /> - - - — -- <br /> General Pro�ect Information � � � -" - ' �� �: -�---: — <br /> ' .,. �,,•, <br /> — _. _- _ - <br /> Project Filename: S:\FHDATA\PROJECTS\Z&B\stonebay rambler cascade.rhv <br /> Project Title: Rambler Townhome Duplex (Cascade) <br /> Designed By: Randy <br /> Project Date: 4-24-06 <br /> Project Comment: Stone Bay, Orono <br /> Client Name: ZB Companies, Inc. <br /> Client Address: 10300 10th Avenue North <br /> Client City: Plymouth, Minnesota 55441 <br /> Ciient Phone: 763-545-1200 <br /> Client Fax: 763-545-1112 <br /> Client E-Mail Address: zbcompanies@aol.com <br /> Client Comment: <br /> Company Name: Flare Heating &Air conditioning, Inc. <br /> Company Representative: Randy <br /> Company Address: 9303 Plymouth Ave. N. <br /> Company City: Golden Valley, Minnesota 55427 <br /> Company Phone: 763-542-1166 <br /> Company Fax: 763-542-3101 <br /> Company E-Mail Address: rimker@flareheating.com <br /> Company Website: flareheating.com <br /> Company Comment: You Can Feel The Difference <br /> __ _ <br /> _ _ ___ _ __ -- - __ __ <br /> _ -- --- -- - <br /> Design Da'ta <br /> P,eference City: Minneapolis, Minnesota <br /> Daily Temperature Range: Medium <br /> Latitude: 44 Degrees <br /> Elevation: 834 ft. <br /> Altitude Factor: 0.970 <br /> Elevation Sensible Adj. Factor: 1.000 <br /> Elevation Total Adj. Factor: 1.000 <br /> Elevation Heating Adj. Factor: 1.000 <br /> Elevation Heating Adj. Factor: 1.000 <br /> Outdoor Outdoor Indoor Indoor Grains <br /> Dry Bulb Wet Bulb Rel.Hum Dry Bulb Difference <br /> Winter: -20 0 0 72 p <br /> Summer: 95 75 50 75 36 <br /> Check 1=iaur2s _- - _ __ _ _ _ _ _ __ _ __ <br /> Total Building Supply CFM: 1,042 CFM Per Square ft.: 0.268 <br /> Square ft. of Room Area: 3,894 Square ft. Per Ton: 1,414.871 <br /> _ _ - _ ___ _ _ -- <br /> Building Loaas � <br /> -- _ — <br /> Total Heating Required With Outside Air: 73,518 Btuh 73.518 MBH <br /> Total Sensible Gain: 24,914 Btuh 75 % <br /> Total Latent Gain: 8,112 Btuh 25 % <br /> Total Cooling Required With Outside Air: 33,026 Btuh 2.752 Tons (Based On Sensible + Latent) <br /> 2.768 Tons (Based On 75% Sensible Capacity) <br /> Notes - - _- -- __ <br /> Calculations are based on 7th edition of ACCA Manual J. <br /> Ali computed resuits are estimates as building use and weather may vary. <br /> Be sure to select a unit that meets both sensible and latent loads. <br /> S:\FHDATA\PROJECTS\Z&B\stoneba rambler cascade.rhv <br /> Y Monday, April 24, 2006, 11:50 AM <br />