My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-00827 - septic mound system
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
75 Bayside Trail - 06-117-23-22-0030
>
Septic
>
2014-00827 - septic mound system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:18 PM
Creation date
1/15/2016 12:55:23 PM
Metadata
Fields
Template:
x Address Old
House Number
75
Street Name
Bayside
Street Type
Trail
Address
75 Bayside Tr
Document Type
Septic
PIN
0611723220030
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Mound Materials orksheet UNIVERSITY � : <br /> Minnesota Poilution OF 1�INi�tESOTA <br /> Control Agency '-�\�' <br /> ProjectlD: v 11.09.22 <br /> A• Calculate Bed (rock)Volume:Bed Length (2.0 X Bed Width 2.6)X Depth =Volu e ft' <br /> 63.0 ft x 0.0 ft x �.0 = 630.0 ft' <br /> Divide ft'by 27 ft'/yd'to calculate ubic ards: <br /> 6 0.0 ft' = 27 = 23.3 yd' <br /> Add 20%for constructability: 3.3 yd?X 1.2 = 2$,p yd' <br /> B. Calculate Clean Sand Vo(ume: <br /> Votume Under Rock 6ed:Averoqe Sand Depth x Media Width x Medio Lenqth =cu ic feet <br /> 2.4 ft X 10.0 ft X 63.0 ft = 1480,5 ft' <br /> For a Mound on a slope from 0-1% <br /> Volume from Length=((Upslope Mound Height-1)X Absorption Width Beyond Bed Media Bed Length) <br /> ft -1) X X ft = <br /> Volume from Width=((Upslope Mound Height-1)X Absorption Width Beyond Bed Media Bed Width) <br /> ft -1) X X ft = <br /> Totaf Clean Sand Volume: Volume from Length+Volume from Width+Volume Un er Media <br /> ft' + ft' + ft; = ft' <br /> For a Mound on a slope greater than 1% <br /> Upslope Volume:((Upslope Mound Height - 1)x 3 x Bed Lenqth)*2=cubic feet <br /> (( 4.0 ft -�) x 3.o ft x 63.0 )=2= 283.5 ft3 <br /> Downsfope Volume:((Downslope Height- 1) x Downslope Absorption Width x Med Length)�2=cubic feet <br /> (( 4.7 ft-�) x 10.0 ft x 63.0 )--z= 1165.5 ft' <br /> Endslope Volume:(Downslope Mound Height- 1)x 3 x Media Width =cubic feet <br /> ( 4.7 ft-1 ) X 3.0 ft X 10.0 ft = 111.0 ft' <br /> Total Ctean Sand Volume:Upslope Volume +Downs(ope Volume +fndslope Volu +Volume Urtder Media <br /> 283.5 ft' • 1165.5 ft3 + 111.0 ft' . 1480.5 ft'= 3040.5 ft' <br /> Divide ft'by 27 ft'/yd'to catculate cubic yards: 30 0.5 ft' : 27 = 112.6 yd' <br /> Add 20%for constructabitity: � 2,6 3 - 3 <br /> yd X 1.2 135.1 yd <br /> G Calculate Sandy Berm Volume: <br /> Total Berm Volume(opprox):((Avg.Mound Height-0.5 ft topsoil)x Mound Width x Mound Length)+2=cubic feet <br /> ( 4.4 _ 0.5 )ft X 45.0 ft X 91.0 )>2= 7883.6 ft' <br /> Total Mound Vo(ume-Clean Sand vo(ume-Rock Volume=cubic feet <br /> 7883.6 ft' - 3040.5 fc3 - 630.0 ft' = 4213.1 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 42 3.1 ft' : 27 = 156.0 yd3 <br /> Add 20%for constructability: 1 6.0 yd' x 1.2 = 187.2 yd3 <br /> D. Calculate Topsoil Materiol Vofume:Tota!Mound Width X Tota!Mound Length X.5 <br /> 45.0 ft X 91.0 ft x 0.5 ft = 2047J ft' <br /> Divide ft'by 27 ft'/yd'to catculate cubic yards: 20 7.7 ft� = 27 = 75,g yd3 <br /> Add 20%for constnxtability: 7 .8 yd' x 1.2 = 91.0 yd' <br />
The URL can be used to link to this page
Your browser does not support the video tag.