My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-P09103 (Demo)
Orono
>
Property Files
>
Street Address
>
B
>
Baldur Park Road
>
1376 Baldur Park Road - 08-117-23-31-0005
>
Permits/Inspections
>
2005-P09103 (Demo)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:43:23 PM
Creation date
1/14/2016 1:02:05 PM
Metadata
Fields
Template:
x Address Old
House Number
1376
Street Name
Baldur Park
Street Type
Road
Address
1376 Baldur Park Rd
Document Type
Permits/Inspections
PIN
0811723310005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f � <br /> � . <br /> 8. Within 5 working days of superstructure removal,a final inspection shall be requested. The <br /> site shall be left clean and clear of a11 debris,with any excavation filled with earth level with <br /> the adjacent ground elevation(except when such excavation is to be used as part of a new <br /> building and such new building is actually under construction). <br /> 9. The undersigned owner sha11 and hereby dces indemnify and hold harn�iless the City of <br /> Orono, its agents, employees and assigns from and against all claims, damages, losses or <br /> expenses,including attomey fees,against the Ciiy,its agents,employees and assigns arising <br /> out of or resulting from the demolition described herein as performed by the property owner, <br /> his employees,agents, subcontractors or assigns. <br /> 10. Septic systems must be abandoned per Minnesota Rules Chapter 7080. All sepric tanks must <br /> be pumped,crushed and filled with native soils. An inspection is required after the tanks aze <br /> pumped and before the tanks are crushed and filled. <br /> PERMIT TYPE AND FEE CALCULATION <br /> $50.00-Principal Structure <br /> � $30.00-Accessory Structure <br /> 1. Subtotal of above permit requested $ <br /> 2. State Swcharge $ •S4 <br /> 3. TOTAL PERMIT FEE(add lines 1-2 above) $ <br /> The undersigned hereby applies to the City of Orono for issuance of a Demolition Pernut,agrces to <br /> do all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota,and certifies that a11 statements made o is pplication are complete,true and correct. <br /> APPLICANT'S SIGNATURE: �(VG� Date: ��� 7��� <br /> OWNER'SSIGNATURE: D�e: �� 7�G S� <br /> APPROVED BY: Date: `� - ( - � S <br /> uilding Ot�icial) <br /> �*ZONING DISCLOSURE REQUIRED? • •YES • �i0 <br /> • This Must Be Filled Out B Zo ' artment - For Either er, A Zoning Official Must Sign All <br /> Y �B � <br /> Appiications <br /> *APPROVED BY• - � • D�� <br /> (Zoning Official) <br /> ResetForm <br />
The URL can be used to link to this page
Your browser does not support the video tag.