My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-P09103 (Demo)
Orono
>
Property Files
>
Street Address
>
B
>
Baldur Park Road
>
1376 Baldur Park Road - 08-117-23-31-0005
>
Permits/Inspections
>
2005-P09103 (Demo)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:43:23 PM
Creation date
1/14/2016 1:02:05 PM
Metadata
Fields
Template:
x Address Old
House Number
1376
Street Name
Baldur Park
Street Type
Road
Address
1376 Baldur Park Rd
Document Type
Permits/Inspections
PIN
0811723310005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . � � �� A������� �� <br /> J � � �� �� <br /> CITY OF ORONO APPLICATION FOR DEMOLITION PERMIT <br /> P.O. Box 66(2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT <br /> General Instructions <br /> 1. You may be required to obtain other permits,i.e. well abandonment, etc. <br /> 2. Work must not begin unless the pernut card is available on the job site. <br /> 3. A 24 hour notice is required for all inspections. Call (952)249-4600. <br /> JOB SITE ADDRESS: 13 (o �C,1 U lr �C,�,�''� l�G <br /> Occupancy Type: Residential Commercial <br /> OWNER'S NAME: �0.�►O���- i✓�„S 6 n Phone:� c1S��-- �1� '' � �"f'�� <br /> Mailing Address: �jc�.►.,�-�, City: O r 0 V�O <br /> CONTRACTOR'S NAME: �.--�4�-I+e I�l i^ 6 Vl`J�' Bus.No.: Co � a-" �� t`3�7 Z7 <br /> MailingAddress:�/�D [1-I'�+-'1'� Wd� Gr City: (r'rdeh Z+/o <br /> Demolition if planned by means of: manual disassembly <br /> _�heavy equipmen; <br /> Permits Issued: <br /> # Well Abandonment <br /> In return for issuance of said Demolition Permit,the undersigned owner hereby agrees as follows: <br /> l. The structure(s) sha11 be kept enclosed and/or secured until such time as demolition is <br /> complete. <br /> 2. Demolition debris will be kept offadjoining property and/orthe public rights-of-way unless <br /> specific prior approval is obtained in writing for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance with all <br /> applicable PCA requirements. <br /> 5. Water wells must be abandoned in accordance with State Health Department regulations. <br /> 6. Sewer and water must be disconnected at the services at the street by qualified contractors. <br /> 7. Inspection required when all debris has been removed,before backfilling. <br />
The URL can be used to link to this page
Your browser does not support the video tag.