Laserfiche WebLink
. <br /> 7. Witlun 5 working days of superstructure removal,a final inspection sha11 be requested. The <br /> site shall be left clean and clear of all debris,with any excavation filled with earth level with <br /> the adjacent ground elevation(except when such excavation is to be used as part of a new <br /> building a�zd such new building is actually under construction). <br /> 8. The undersigned owner shall and hereby does indemnify and hold harmless the City of <br /> Orono, its agents, employees and assigns from and against all claims, damages, losses or <br /> expenses,includiilg attoi�ley fees,against the City,its agents,employees and assigns arisulg <br /> out of or resulting from tlie demolition described herein as performed by the property owner, <br /> his employees, agents, subcontractors or assigns. <br /> 9. Septic systems must be abandoned per Minnesota Rules Chapter 7080. All septic tanks must <br /> be pumped,crushed and filled witli native soils. An inspection is required after the tanks are <br /> pumped and before the tanks are crushed and filled. <br /> PERMIT TYPE AND FEE CALCULATION <br /> �/ ,$50.00 -Principal Structure <br /> $30.00 -Accessory Structure <br /> 1. Subtotal of above permit requested $ `-jQ.U� <br /> 2. State Surcharge $ .50 <br /> 3. TOTAL PERMIT FEE(add lines 1-2 above) $ S� �5 v <br /> T'he undersigned hereby applies to the City of Orono for issuance of a Demolition Permit,agrees to <br /> do a11 work in strict accordance with the ordinances of the City and the regulatioris of the State of <br /> Minnesota,and certifies that a11 statements made on this application are complete,true and correct. <br /> APPLICANT'S SIGNATURE: �' � � '' <br /> • �i`""Date• •���y- <br /> OWNER'S SIGNATURE: � �� � Date: ' � /d �� <br /> APPROVED BY: Date: 1- t 9 - a S <br /> N a�� ! s L. l�U E (Z 1'� S T 63� � i s c.�nr n+ e �� �-i <br /> s��� �4-t s�'tu�-z--� ,Ns�. (l,eGj u � ✓U��J (0/L c o 2. � <br /> ���� �� <br />