My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-P08350 (2)
Orono
>
Property Files
>
Street Address
>
A
>
Arbor Street
>
1245 Arbor Street - 10-117-23-31-0105
>
Permits/Inspections
>
2005-P08350 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:25:10 PM
Creation date
1/14/2016 12:03:42 PM
Metadata
Fields
Template:
x Address Old
House Number
1245
Street Name
Arbor
Street Type
Street
Address
1245 Arbor Street
Document Type
Permits/Inspections
PIN
1011723310105
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> 7. Witlun 5 working days of superstructure removal,a final inspection sha11 be requested. The <br /> site shall be left clean and clear of all debris,with any excavation filled with earth level with <br /> the adjacent ground elevation(except when such excavation is to be used as part of a new <br /> building a�zd such new building is actually under construction). <br /> 8. The undersigned owner shall and hereby does indemnify and hold harmless the City of <br /> Orono, its agents, employees and assigns from and against all claims, damages, losses or <br /> expenses,includiilg attoi�ley fees,against the City,its agents,employees and assigns arisulg <br /> out of or resulting from tlie demolition described herein as performed by the property owner, <br /> his employees, agents, subcontractors or assigns. <br /> 9. Septic systems must be abandoned per Minnesota Rules Chapter 7080. All septic tanks must <br /> be pumped,crushed and filled witli native soils. An inspection is required after the tanks are <br /> pumped and before the tanks are crushed and filled. <br /> PERMIT TYPE AND FEE CALCULATION <br /> �/ ,$50.00 -Principal Structure <br /> $30.00 -Accessory Structure <br /> 1. Subtotal of above permit requested $ `-jQ.U� <br /> 2. State Surcharge $ .50 <br /> 3. TOTAL PERMIT FEE(add lines 1-2 above) $ S� �5 v <br /> T'he undersigned hereby applies to the City of Orono for issuance of a Demolition Permit,agrees to <br /> do a11 work in strict accordance with the ordinances of the City and the regulatioris of the State of <br /> Minnesota,and certifies that a11 statements made on this application are complete,true and correct. <br /> APPLICANT'S SIGNATURE: �' � � '' <br /> • �i`""Date• •���y- <br /> OWNER'S SIGNATURE: � �� � Date: ' � /d �� <br /> APPROVED BY: Date: 1- t 9 - a S <br /> N a�� ! s L. l�U E (Z 1'� S T 63� � i s c.�nr n+ e �� �-i <br /> s��� �4-t s�'tu�-z--� ,Ns�. (l,eGj u � ✓U��J (0/L c o 2. � <br /> ���� �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.