My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-P08350 (2)
Orono
>
Property Files
>
Street Address
>
A
>
Arbor Street
>
1245 Arbor Street - 10-117-23-31-0105
>
Permits/Inspections
>
2005-P08350 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:25:10 PM
Creation date
1/14/2016 12:03:42 PM
Metadata
Fields
Template:
x Address Old
House Number
1245
Street Name
Arbor
Street Type
Street
Address
1245 Arbor Street
Document Type
Permits/Inspections
PIN
1011723310105
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ' . .��� ���3 5� <br /> � CITY OF ORONO APPLICATION FOR DEMOLITION PERMIT <br /> P.O. Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT � <br /> \� ��\ <br /> GeneralInstructions j � <br /> 1. You may be required to obtain other permits, i.e. well abandoiunment,et . �� � �-� ,� <br /> 2. W o r k m u s t n o t b e g i n u n l e s s t h e p e n n i t c a r d i s a v a i l a b l e on the job site. � r � � <br /> 3. A 24 hour notice is required for all inspections. Call (612)249-46Q0. ���\ o� O k <br /> � � <br /> JOB SITE A.DDRESS:,�.��/x- l��B�� 57�R�G f � � <br /> Occupancy Type: _�Residential Commercial <br /> OWNER'SNAME: ��h�Yt �.�"�/'/�e�� P11one: <br /> Mailing Address: City: <br /> CONTRACTOR'SNAME:��h� G��hs�h�c�io�v _Bus.No.:7/3-97��G'Gs <br /> Mailing Address:� p �o�C �77 City: �e%�rrv <br /> Demolition if planned by ineans of: nlanual disassembly <br /> v heavy equipment <br /> Permits Issued: <br /> # Well Abandonment <br /> In return for issua.iice of said Demolition Pernlit,the undersigned owner hereby agrees as follows: <br /> 1. The structure(s) shall be kept enclosed and/or secured until such tune as deinolition is <br /> complete. <br /> 2. Demolition debris will be kept off adj oining properry and/or the public rights-of-way unless <br /> specific prior approval is obtained in writing for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance with all <br /> � applicable PCA requirements. <br /> 5. Water.welks must be abandoned in accordance with State Health Department regulations. <br /> 6. Inspection required when a11 debris has been removed,before backfilling. <br />
The URL can be used to link to this page
Your browser does not support the video tag.