My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-20-2015 Planning Commission Packet
Orono
>
Planning Commission
>
2015
>
07-20-2015 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2020 8:43:11 AM
Creation date
1/12/2016 1:34:15 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
15-3763 <br /> July 16,2015 <br /> Page 3 of 3 <br /> Impacts to Svrrounding Residential Development <br /> The impacts to surrounding residential properties are anticipated to be zninimal. There will be <br /> some vehicle and machinery noise during well construction, but after that the site will only <br /> require the occasional maintenance vehicle using Dickey Lake Drive and Pine Ridge Lane to <br /> access the well building. A new driveway will be constructed extending from Pine Ridge Lane <br /> to the well house. The City will continue to maintain Pine Ridge Lane. <br /> Summary of Issues for Discussion <br /> 1. Are there aziy negative impacts associated with the lot line rearrangement? <br /> 2. Are there any negative impacts associated with the rezoning: <br /> 3. Are there any other concerns that need to be addressed? <br /> 5taff Recammendation <br /> Planning Commission should hold the Public Hearing and receive comments from the public. <br /> Staff recommends approval of the proposed lot line rearrangement and rezoning as proposed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.