Laserfiche WebLink
' } <br /> 15-3783 <br /> Juty 16,2015 <br /> Page 7 of 8 <br /> -Confirm pond storage meets sizing requirements <br /> -High water level of pond must be outside Wetland#2 Buffer <br /> - Storm sewer caIculations required <br /> -Remove sump from pond outlet <br /> -Install trashguards at storm sewer aprons <br /> Site Plan: <br /> -Extension of Kintyre Lane raises a number of issues for discussion(See Eahibit E,page 2) <br /> -Indicate updated Drainage&Utility easements on plan <br /> -Revise building setbacks to coordinate with wetland setbacks as necessary <br /> - Pror•ide detail on access for Lot 5 <br /> - Buf�''ers for Wetlands #1 and #2 shown at SO' 6ut MCWD Functiottal Assessment Map shows <br /> them ta be Preserve Wetlarids requiring 7S'Buffers... <br /> -Certain septic sites appear to be in conflict with wetland setbacks and buf�ers, etc. <br /> Prelimtnary Pls►t: <br /> -D&U Easements need to be revised to accommodate storm sewer and wetlands <br /> -F&C Easement reqvired over all wetlands <br /> - Conservation Design Plan indicates preservation areas - should consider `No Cnt' easements and <br /> covenants <br /> -Kintyre Lane extension will require standard easements for private road <br /> Preliminary Grading Plan: <br /> -SWPPP will have to be provided as part of final plat drawings <br /> -Show grading necessary to remove e�cisting driveway for Lot 5 <br /> -Revise storm sewer alignment between road and pond <br /> -Consider establishing house pads to create ne eausting grades <br /> Preliminary Street Plan: <br /> - Review street horizontal curve data <br /> • Fue Chief to review cald-de-sac <br /> - Street plan and site plan need to be consistent street width <br /> While a number of the Engineer's comments will be easily resolved, many relate to basic site <br /> layout concerns that should be further investigated. <br /> Summary of Issues for Discussion <br /> 1. The unusually high number of drainfreld sites located at the mitumutn required setbacks <br /> is a concern. <br /> 2. The impact of 40' and 50' wetland buffers is significant. If 75' buffers are required, the <br /> impact is extremely critical. <br /> 3. What is ptanned for the house on Lot 57 What wi�l happen with the access outlot it <br /> currently uses -should that be part of this plat, given that only the iuutial few feet are <br /> actually used by the neighbor at 300 Stubbs Bay Road7 Can applicant confirm where the <br /> existing septic system is in relation to the new lot line abutting Lot 4? <br /> 4. Should the existing width of Kintyre Lane, which will become substandard per code <br /> requirement, be expanded to meet code7 What are the raznifications of such an <br /> extension? <br />