My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-25-2015 Council Packet
Orono
>
City Council
>
2015
>
10-25-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2015 2:29:01 PM
Creation date
12/1/2015 2:23:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
22 MISCELLENEOUS GROUTING GAL 5 $50.00 $250.00 <br />23 MANHOLE LINING LF 4 $750.00 $3,000.00 <br />MAPLE RIDGE LN <br />24 CURED IN PLACE PIPE (CIPP) APPROXIMATELY 8" MEASURE LF 1,530 $28.50 $43,605.00 <br />25 LATERAL REINSTATEMENT (ANY SIZE)EACH 9 $150.00 $1,350.00 <br />26 PROTRUDING TAP TRIMMING (NON-IRON, ANY SIZE)EACH 2 $500.00 $1,000.00 <br />27 LATERAL TOPHAT EACH $4,000.00 $0.00 <br />28 BY-PASS PUMPING - STAND-BY HRS 10 $250.00 $2,500.00 <br />29 MANHOLE JOINT SEALING EACH 9 $625.00 $5,625.00 <br />30 MANHOLE INVERT RECONSTRUCTION EACH 2 $850.00 $1,700.00 <br />31 DOGHOUSE RECONSTRUCTION EACH 4 $250.00 $1,000.00 <br />32 MISCELLENEOUS GROUTING GAL 5 $50.00 $250.00 <br />33 MANHOLE LINING LF 2 $750.00 $1,500.00 <br />TOTAL ESTIMATED CONSTRUCTION COST: $205,227.50 <br />25% ENGINEERING, ADMINISTRATION, FINANCING $51,306.88 <br />TOTAL ESTIMATED PROJECT COST: $256,534.38
The URL can be used to link to this page
Your browser does not support the video tag.