Laserfiche WebLink
ENGINEER'S ESTIMATE <br />2015 SANITARY SEWER REHABILITATION <br />CITY OF ORONO <br />BMI PROJECT NO. C13.109540 <br />ITEM ESTIMATED UNIT TOTAL <br />NO.BID ITEM UNIT QUANTITY PRICE AMOUNT <br />1 MOBILIZATION LS 1 $7,000.00 $7,000.00 <br />2 TRAFFIC CONTROL LS 1 $2,500.00 $2,500.00 <br />BALDUR PARK RD <br />3 CURED IN PLACE PIPE (CIPP) APPROXIMATELY 8" MEASURE LF 1,265 $28.50 $36,052.50 <br />4 LATERAL REINSTATEMENT (ANY SIZE)EACH 20 $150.00 $3,000.00 <br />5 PROTRUDING TAP TRIMMING (NON-IRON, ANY SIZE)EACH 2 $500.00 $1,000.00 <br />6 LATERAL TOPHAT EACH $4,000.00 $0.00 <br />7 BY-PASS PUMPING - STAND-BY HRS 10 $250.00 $2,500.00 <br />8 MANHOLE JOINT SEALING EACH 5 $625.00 $3,125.00 <br />9 MANHOLE INVERT RECONSTRUCTION EACH 2 $850.00 $1,700.00 <br />10 DOGHOUSE RECONSTRUCTION EACH 2 $250.00 $500.00 <br />11 MISCELLENEOUS GROUTING GAL 5 $50.00 $250.00 <br />12 MANHOLE LINING LF 2 $750.00 $1,500.00 <br />KELLY AVE <br />13 CURED IN PLACE PIPE (CIPP) APPROXIMATELY 8" MEASURE LF 2,120 $28.50 $60,420.00 <br />14 LATERAL REINSTATEMENT (ANY SIZE)EACH 23 $150.00 $3,450.00 <br />15 PROTRUDING TAP TRIMMING (NON-IRON, ANY SIZE)EACH 1 $500.00 $500.00 <br />16 LATERAL TOPHAT EACH $4,000.00 $0.00 <br />17 BY-PASS PUMPING - LIFT STATION LS 1 $5,000.00 $5,000.00 <br />18 BY-PASS PUMPING - STAND-BY HRS 10 $250.00 $2,500.00 <br />19 MANHOLE JOINT SEALING EACH 16 $625.00 $10,000.00 <br />20 MANHOLE INVERT RECONSTRUCTION EACH 2 $850.00 $1,700.00 <br />21 DOGHOUSE RECONSTRUCTION EACH 3 $250.00 $750.00