Laserfiche WebLink
��.• - --, ' <br /> � O� <br /> O :. O CITY of ORONO <br /> • � �;��=� RESOLUTION OF THE CITY COUNCIL <br /> a! ��� ., D+ <br /> � ., ..b�.�, � No. � 3 s � <br /> '�� � b' Gti . <br /> ��kEsHOg'� <br /> requirements of the LR-lA zoning district. A municipal sewer lateral exists approximately 20 <br /> feet from the properry, requiring no extension of the municipal sewer. The costs of replacing <br /> the existing failing septic system with a fully conforming septic system approximate the costs <br /> of the connection charge for the 1985-LS-1 project plus the SAC charge and connection costs <br /> to be borne by the property owner; and � . <br /> WHEREAS, allowing the property to connect to the municipal sewer will not be <br /> in conflict with the goals and policies of the Orono Community Management Plan, in that no <br /> extension of municipal sewer is required, no new high density development will occur as a result <br /> of the MUSA boundary expansion, and Lake Minnetonka will be further protected by the <br /> elimination of a failing septic system located on a lakeshore lot; and <br /> WHEREAS, the applicant has requested that the current connection charge of <br /> $11,218.00 be split into a portion to be paid prior to connection and a portion to be levied as <br /> a special assessment, in proportions approxunating those paid and remaining assessments of the <br /> • properties in the Crystal Bay project; and <br /> . WI�REAS, the City wishes to establish an easement for possible future sewer <br /> construction which may occur on or in the right-of-way adjacent to the property. <br /> NOW, THEREFORE, BE IT RESOLVED, by the City Council of Orono, <br /> Minnesota that the property at 1940 Shoreline Drive shall be allowed to make connection to the <br /> municipal sewer subject to the following conditions: <br /> 1. Prior to making the connection, applicant shall pay to the City 8/15th's of the <br /> $11,218.00 connection charge or $5,982.91. The remaining $5,235.09 shall be <br /> levied as a special assessment for a period of seven (7) years at an interest rate <br /> of 9.20%. The effective date of this levy shall be November 22, 1993. � <br /> 2. Applicant shall pay the current sewer availability charge and applicant's <br /> contractor shall obtain a connection permit prior to connecting to the municipal <br /> sewer. <br /> 3. The method and location of the connection, which will likely require installation <br /> of a new stub into the existing sewer line, shall be approved by the Public Works <br /> Department prior to making such connection. The applicant shall bear all costs <br /> of making said connection and restoration of City right-of-ways, if required. <br /> • � <br /> . Fam 5005 IXst Omro <br />