My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3559
Orono
>
Resolutions
>
Reso 0001-7499
>
Reso 3500 - 3599 (November 28, 1994 - September 11, 1995)
>
Resolution 3559
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2019 10:25:03 AM
Creation date
11/18/2015 3:16:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
O . <br /> � �' CITY of ORONO � <br /> O y O _ <br /> �' <br /> � �:��-� ,� RESOLUTION OF THE CITY COUNCIL <br /> �, ���,1 `y�� ti No. 3 � 5 � <br /> ti a, � <br /> ,��9$ Og'�G , <br /> ESS <br /> CONCL[TSIONS, ORDER AND CONDITIONS <br /> Based upon one or more of the above fmdings, the Orono City Council hereby <br /> grants variances to Municipal Zoning Code Section 10.22, Subdivisions 2 granting a hardcover <br /> variance within the 75-250' setback area of 825 s.f. or 4.29% and per Section 10.24, <br /> Subdivision 5 (A) grants a height variance for an observation tower that will be 35' in height <br /> subject to the following conditions: - <br /> � 1. Prior to filing an application for new construction, applicants must apply for the <br /> iegal combination of the five separate parcels that make up the building site. <br /> 2. Upon application for a building permit, applicants will make payment for a sewer <br /> connection charge at $11,744.50 per the 1995 fee schedule and a Sewer <br /> Availability Charge of $850.00 based on the MWCC's 1995 fee schedule. <br /> • 3. � The City shall require permits for the installation of the drainfield and extension <br /> of municipal sewer to residence. Applicants' consultant/contractor shall provide <br /> engineering plans with appropriate design and spec information for the review of . <br /> the City Engineer. � <br /> 4. Upon the issuance of a certificate of occupancy for the completion of the <br /> residence structure, applicants may apply for a permit to install a residential dock. <br /> Applicants shall install dock at the eastern shoreline so as not to encroach <br /> wetlands at the southem shoreline. � <br /> � . 5. Authorities granted by this resolution run with the properry not with the <br /> applicants, but are permissive only and must be exercised by application for a <br /> building permit within one year of the date of Council approval, or this variance <br /> will expire on that date (May 8, 1996). <br /> 6. Violation of or non-compliance with any of the terms ar�d conditions of this <br /> resolution shall constitute a violation of the zoning code, shall automatically <br /> terminate any authority granted herein, and shall be punishable as a misdemeanor. <br /> • � Page 3 of 5 <br /> . - Fam5005 DiskOmno <br />
The URL can be used to link to this page
Your browser does not support the video tag.