Laserfiche WebLink
go <br />3.3 The Owner reserves the right to reject any Bid if the evidence <br />M� submitted by, or investigation, of such Bidder fails to satisfy the Owner that <br />such Bidder is properly ^tialified to carry out the obligations of the contract, <br />and to comolete the wo )ntemplated therein. <br />to <br />+. Examination of Can, zt Documents and Site. <br />4.1 Before submitting a Bid, each Bidder must (a) examine the Contract <br />A Documents thoroughly, (b) visit the site to familiarize himself with Local <br /># conditions that may in any manner affect cost, progress or performance of the <br />Work, (c) familiarize himself with federal, state and local Laws, ordinances, <br />ON rules and regulations that may in any manner affect cost, progress or performance <br />Ir of the Work; and (d) study and carefull-- correlate Bidder's observations with the <br />Contract Documents. <br />A <br />4.2 Reference is made to the Supplementary Conditions for the identification <br />of those reports of investigations and tests of subsurface and latent physical <br />conditions at the site or otherwise affecting cost, progress or performnce of <br />A the Work which have been relied upon by Engineer in preparing the Drawings and <br />Specifications. Owner will wake copies of such reports available to any Bidder <br />requesting them. 11hese reports are nct guaranteed as to 3ccurac;.1 or completeness, <br />nor are tney part of the Contract facu-nents. Before submitti.g ais Bid, each <br />Bidder wi.1, at his own expense, make such additional investigations and tests <br />as the B;'+er may deem necessary to deter -mine his Bid for performance of the <br />Work in oraance with the time, price and other terms and conditions 3f the <br />Contract Doc,r..ats. <br />4.3 On request Owner will provide each 3idder access to the site to conduct <br />such investigations and <br />tests <br />as each Bidder <br />.deems necessary for submission of <br />N <br />his Bid. <br />p. <br />4.4 The lands ipon <br />which <br />the Mork is to <br />be performed, rights -of -way for <br />access thereto and other <br />lands <br />designated for <br />use by `ontractor in performing <br />~" <br />the Work are identified <br />in the <br />Supplementary <br />onditions, ;ener3l Requirements <br />or Drawings. <br />y.5 The submission of a Bid will constitute an incontrovertible representa- <br />tion iy the Bidder that he has complied with every requirement of this Article j <br />and that the Contract Documents are sufficient in scope and detail to indicate <br />«. and convev understanding of all terms and conditions for performance of the Work. <br />interpretations. <br />All questions about the meaning or intent of the Contract Oocumenti shall bt <br />submitted to Engineer in writing. Replies will be issued by addenda mailed )r <br />delivered to all parties recorded tiv Engineer as having received the Bidding <br />Documents. )uestions received less than two .days prior to this date for opening <br />of Bids will not be answered. Only juesti:�ns answered by forma. written Addenda <br />will be binding. Or31 and -)then interpretations or clarifizations will be <br />without legal affect. <br />.r <br />