Laserfiche WebLink
I j',, I J I \ I 1. J l-' , \ l , :-, I \ \ , \ I.. , I I I 'I. I 1 \ I 1 \ l 1 .. , '-1 , I : ~ I I , \ I \ \ , I I\. 1, '1 I I I I 1 <br />)5(.;) <br />FLOW <br />gpd <br />111l'ilSlHl'd X ----gpd <br />k-fl <br />SEPTIC TANK VOLUMF <br />B. --~ /?Oc,) gallons <br />C. <br />D. <br />E. <br />F. <br />SOILS (Site evaluation data) <br />Depth to restricting layer=___ 'f._O __ <br />Maximum depth of system C -3 ft = __ j._ (). <br />Texture~.k, e ".'\ Percolation rail' _l_'(_-t_j <br />SSF U"2 sq ft/ gpd <br />TRENCH BOTTOM AREA <br />f<'('( <br />feet <br />MP! <br />H. For trenches with 6 inches of rock belov,, the pipe: <br />A x F = __ x ___ = __ sq ft of bottom area <br />I. For trenches with 12 inches of rock below the pip<': <br />Ax F x 0.8 = x x 0.8 = __ sq ft of bottom area <br />J. For trenches with 18 inches of rock below the pipe: <br />A x F x 0.66 x x 0.66 _____ sq ft of bottom area <br />K. For trenches with 24 inches of rock below the pipe: <br />A x F x 0.6 = __ x __ x 0.6 = __ sq ft of bottom area <br />BED BOTTOM AREA <br />L. For Gravity beds with 6 or 12 inches of rock below the pipe; <br />1.5 x A x F = 1.5 x __ x __ = __ sq ft of bottom area <br />For Pressure beds with 6 or 12 inches of rock below the pipe; <br />A x F = __ x __ = __ sq ft of bottom area <br />ROCK VOLUME IN CU Ff <br />M. Rock depth below distribution pipe plus 05 foot times bottom area: <br />M =Rock depth+ 6 inches x Area (H,I,J,L,K) <br />( __ + 0.5 ft) x __ = __ cu ft <br />ROCK VOLUME IN CU YDS <br />N. Volume in cu ft divided by 27 <br />0. <br />M + 27 = cu yds _ + 27 = __ cu yds <br />ROCK WEIGHT <br />Cubic yards times 1.4 = tons <br />N x 1.4 = tons xl.4= <br />DISTRIBUTION <br />tons <br />(Check one based on slope) __ Bed(< 6% slope) <br />Trenches V"Drop boxes (any slope) __ Distribution box(< 3%) <br />SYSTEM LENGTH <br />P. Select width = ft <br />Q. Divide bottom area by width: (H, I, J, or K) + P = lineal feet <br />..._+_=_lineal feet <br />Gravelless Pipe <br />( 10" :A x F + 3)= Lineal Feet ( 8" :A x F + 2)= Lineal Feet <br />Chamber (Ax F + width of chamber) <br />"lSc:..> x f,'L'1+ ~= ~lineal feet <br />LAWN AREA <br />R. Select trench spacing, center to center = ~ fed <br />S. Multiply trench spacing by lineal feet Rx Q = sg ft of lavm area <br />~x~ /S?Qsqft <br />LAYOUT (Use other side) <br />J. Select an appropriate scale; one square = . ________ feet. <br />2. Shov,, pertinent property boundaries, right-of-way, easements. <br />3. Show location of house, garage, drivewav, ,md all other <br />improvements, existing or proposC'd <br />-1. Show location and layout of sewagt• I r<'atnwnt ½\'St<'m <br />5. Show location of water supply vvell <br />6. Dinwnsinn all set backs and separation d1st.i11< ,,~ <br />~ "i_ma1i:d \t·,,•,tt•c I ltm 111 (;allnn~ pn I?''' ,~pd! <br />Numlw, <br />of rvp<' t Type If Typ<' Ill Typ,· IV <br />llcd100111, <br />1(XJ 225 180 Nl'i <br />1 450 l(Xl 218 "' 4 600 .l75 25<, thl· <br />5 750 450 294 \'.thll'-' <br />"' <, 900 525 112 lhl' <br />7 1050 6lXl .170 lllhn <br />n1fu111n~ 8 1200 675 408 <br />Numhcr Minimum Minimum <br />Septic Tank Capaci1y \\'ith of Liquid Garbage- <br />Bcdroo,m Capacity Disp<.1sal <br />(~aflons l traflonsl <br />2 or lcs~ 750 1.125 <br />3 or--1 1.000 1,500 <br />5 or 6 J.500 2,250 <br />7 or 8 2,000 3,000 <br />over 9 Sec fig. C-6 (X J.5) <br />~\II Ch,ni'lrtt'rtSl1n, &. Requm,,'\1 An•,1~ ltlt St.-w.-\~t• ln·,.\lnwnl <br />!'t•r(1ll<11Hlll Ri!lt' ~U.lh·k.-1 t:..U,,n, <br />Soil Texture , ..... , ,. .. 11 .... , I'<' d,1~ Mmult.-:-Jl<..'J m(h f'<'ld.>.\ J"rf~<l.ln· <br />(mpi) ·-· <br />faster than 0.J• ;~oarse Sand ---------- <br />0.1 to5 Sand 0.83 1.20 <br />0.1 toS Fine Sand .. 1.67 0.60 <br />6 to 15 pandyLoam 1.27 0.79 <br />16 to 30 Loam 1.67 0.60 <br />31 to 45 Silt Loam· 2.00 0.50 <br />46 to 60 ClatLoam 2.20 0.45 <br />Slower than 60 ... lay ---(0.24) <br />• Soil too coarse for sewagf:!: treatment. <br />U:.e systems for rapidly penniable suils. <br />-Soil having 50% or more of fine or \'ery fin~ sand . <br />... Soil with too high a percentage or day for <br />installation of an ingn1und standard sy~-tem. <br />T <br />2 m:hCover t 'f Pip,