My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road North
>
820 Brown Road North
>
Land Use
>
78-317, SUBD
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2026 12:46:31 PM
Creation date
4/9/2026 12:33:45 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pu,biic Works <br />Phone 935.3181 320 Washington Av South, Hopkins Minnesota 55343 <br />HeNNePIN COUNTY <br />December `3, 1977 <br />Mr. Henry F. Muhich <br />Zoning A.dministratnr <br />City of Orono <br />P.O. Box 66 <br />Crystal Bay, Minnesota 55323 <br />Dear Mr. Muhich: <br />RE: Proposed Flat - 'The Farm at tong lake <br />CSAH 6 - South ,ide at Dakota Avenue <br />',ection 26, Township 113, Range 23 <br />Hennepin County Plat 11o. 600 <br />Review and Recommendations <br />Thank you for submitting this plat for our review <br />plat and have the following comments: <br />'1 4 <br />7 <br />N 5, re n� <br />a'LT <br />1 <br />,'P r-eviewed the proposed <br />1. Reserve, for road purposes, an easement 10 feet wide, south of and <br />adjacent to the south right of wav line of CSAH 6. <br />2. The proposed new access road from the plat to CSAH 6 is :c.ceptat;lf <br />However, the access must not be located nx)re than 35 e fet West of <br />the invlace field entrance. <br />3. The developer must apply for and obtain an approved entrance permi• <br />before beginning access cons'',.ruction, Entrance permit forms are <br />available from our Traffic Division. <br />4. All lots must have access to the proposed city street. lrid i%i dua' <br />direct access to CSAH 6 will not be permitted. <br />5. All other construction within county right o' way must receive <br />County Enaineer approval prior to oeginnrna istruction. This <br />include_. but is not limited to, drainage revisions, itility <br />construction. trail development. and landscapina. <br />b. All areas within county right of way that are disturbed durino <br />construction mist be restored by the developer. <br />Please direct. Your response or questions on the above-cimrents to Douglas <br />'Mattson at this office. <br />merely, <br />J. M. Wold, P-E. <br />Chief - Planning R Prograrrinn Division <br />cc: Tim Adams, DeveloDer <br />11W : DP M : rm <br />
The URL can be used to link to this page
Your browser does not support the video tag.