Laserfiche WebLink
Page 2 <br />Planning Commission's recommendation calls for an additional <br />dedication of 33' because in previous plans reviewed by <br />Planning Commission the lot line appeared to run to the c<,nter <br />of North Bi-(-)wn Road. The final boundary survey submitted for <br />your revie.. shows 33' already dedicated for the right of way. <br />Please omit item 5 under recommended conditions of approval. <br />(Exhibit ). <br />Wetlands - Lots 4, 5 and 6 have wetlands to the south. A <br />Flowage and Conservation easement will be taken over the <br />wetlands designated at the 98_.42 contour. <br />Septic Review - Caffron has approved the mound septic design <br />proposed for each lot but cautions that slope conditions anc <br />soils makeup severely limit the lots as to locating other <br />septic sights. The tested sight:, must be preserved. <br />