Laserfiche WebLink
MINUTES OF THE ORONO PLANNING CONilvllSSION <br />MEETING HELD ON AUGUST 21 , 1995 <br />(#18 -#2047 Lakeview Golf -Continued) <br />Peterson commented that the Park Commission reviewed the sketch plan and did not <br />propose a trail on the property but would ask for normal park dedication fees . The <br />applicant was informed that this amount would be 8% of the lot area or cash in the <br />equivalence of 8% of the fair market value before development. <br />(#19) #2053 DENNIS PLA TTETER, 809 NORTH BROWN ROAD -SKETCH <br />PLAN OF A 3-LOT RESIDENTIAL SUBDMSION <br />Mr. Flatterer was present. <br />Mabusth reported that the plan is for a division of a 6 .37 acre homestead, located to the <br />north side of Sugar \Voods development , into three lots . All structures would be <br />removed . The property is accessed via a platted road . The property is on a natural <br />environment lake to the northwest, the OHW is at 985 .5 elevation . .4 of the total <br />property is a type 3 wetland adjacent to the normal high water level. Each lot is shown <br />meeting the two acres of dry buildable . It was noted that if the road were moved to the <br />west , the lots would not have the 2 acres of dry buildable required. Lot 2 requires a lot <br />width variance in its present configuration. <br />Mabusth reported that the septic would be mound-type systems , and 3 were tested at an <br />8% slope. The septic code specifically states that mound systems must be placed on a <br />slope no greater than 6%. Staff could not recommend approval of 3 lot plat based on <br />septic limitations . The property is not located within MUSA <br />Mabusth asked the Commission if they would recommend approval of current layout? A <br />lot width variance would be required for lot 2 that gains access via a long platted conidor. <br />The lakeshore lot meets 200 ' at the lake and the 150' setback. <br />Flatterer said he has owned the property for 20 years. The MUSA line is adjacent to the <br />property to the south. The property contains alot of sandy area. The applicant selected <br />the building sites based on the views , maintenance of trees and slopes, and then <br />constructed the lot lines to meet the codes. <br />The applicant was informed that with a 150-200' long road , his likely choices would be for <br />3 executive lots or 2 hobby farms , with contemplation for larger cul-de-sacs required by <br />the fire department. <br />Peterson said it was his opinion that the property consisted of two lots , not three, as there <br />would be too much crowding in order to gain the proper septic. Berg agreed with this <br />conclusion . <br />27