My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road North
>
715 Brown Road North
>
Land Use
>
88-1322, SUBD
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2026 12:23:18 PM
Creation date
3/31/2026 12:18:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Although there are several goals and cbjectives and general <br />issues that are addressed throughout the report, this property <br />and its immediate area are specifically referred to on pages 4') <br />through 52. Three alternatives are presented for the <br />development of this site and the recommended alternative is <br />presented on page 52. <br />Throughout the hearing process, every altern,,tive plan prepared <br />by the land owner's representatives, as well as the City's <br />consulta-^ts assumed the retention of the business/commercial <br />zoning along Highway 12. There has been some recent discussion <br />with the applicants about the development of that portion of <br />the property for multiple residential use. You will notice <br />that portion is not included in the application that is before <br />you. <br />The recommended alternative states that the property north of <br />the commercial area should be developed for single family lo,.., <br />served by public water and sewer. This section also states <br />that the allowed density should not exceed that which is <br />presented on Alternate 3, on page 51. Since Alternate 3 shows <br />25 lots and the proposed preliminary plat contains 25 lots, it <br />is consistent with the intent of the Plan in this area. <br />As you will note in reviewinq this portion ri the Study, the <br />remainder of the discussion centers on tte need to improve the <br />road system in this area. The satisfaction of the remaining <br />Comprehensive Plan directives will occur at the ti:ae that <br />formal plans are prepared for the southern portion of this <br />land. It is in this area that the final alignment of the <br />frontage road will be determined, the specific improvements to <br />the Brown Road, T.H. 12 intersection, and the specific location <br />and design of the storm water pond will all be decided. <br />At this point in the review process, the applicant has <br />indicated a willingness to negotiate reasonable commitments to <br />comply with these planning requirements. The details of these <br />future improvements, and in particular the timing and financiii <br />implications of those off -site improvements, as they relate to <br />this application, will be reviewed in greater detail later in <br />the process. <br />Since this application covers a parcel that is within the <br />Highway 12 Corridor Study Area, it will be subject to revie.: <br />under the new zoning standards tc be adopted to implement the <br />plan in this area. When they are finalized, the proposed <br />Special Minimum Requirements For Rezoning In The Highway i< <br />
The URL can be used to link to this page
Your browser does not support the video tag.