My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4043
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 4000 - 4099 (November 10, 1997 - June 22, 1998)
>
Resolution 4043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2015 12:13:29 PM
Creation date
11/18/2015 12:13:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, s ' <br /> r . � <br /> � O I <br /> � O O <br /> ��b. - C ITY of ORONO <br /> � ' ti <br /> '�' RESOLUTION OF THE CITY COUNCIL <br /> ���kE H�g'�G NO. � <br /> . � S <br /> referenced above and approves the variances as requested based on the unique findings and <br /> hardships noted above; and approves the City's issuing a building permit for the proposed <br /> commercial/retail/office/bank building to Orono Development, LLC subject to the following <br /> conditions: <br /> 1. Upon application for a building permit, applicant shall provide the following <br /> information for the review by the City Engineer: <br /> A. Plans and specifications for service line connections, proposed new <br /> . hydrants if any, etc. As-built plans shall be provided to the City upon <br /> completion. The Public Works Department shall review any potential <br /> problems associated with additional cover placed over existing water or <br /> sewer mains, especially in conjunction with the vacated portions of <br /> Navarre Lane, and applicant shall be responsible for making adjustments <br /> . � of City sewer and water lines, manholes, etc. in a permanent manner <br /> acceptable to the Public Works Department. <br /> B. Final grading, drainage and erosion control plan showing existing and <br /> proposed contours, building locations, elevations, stormwater pond and � <br /> erosion control measures to be used during construction. Plans must <br /> include additional detail on the pond outlet structure which currently is� <br /> not acceptable as a permanent installation. Final stormwater retention <br /> pond plans shall be submitted, and must include information regarding <br /> the method of sealing the pond bottom. Storm sewer calculations must <br /> be provided, and revisions to the plans completed per the City Engineer's <br /> February 13 comments. Applicant shall provide confirmation as to <br /> . � ' whether gutter runoff from Shadywood Road will be entering the site and <br /> � � if so, that it will be adequately handled. A buildin�nermit cannot be � <br /> issued until the Minnehaha Creek Watershed District has a�nrovT ed the <br /> stormwater �lans. <br /> C. Engineering details and design must be provided for the proposed <br /> retaining wall. Due to steep slopes along the north boundary of the site . <br /> and north boundary of the pond, additional retaining walls may be <br /> required to result in slopes no greater than 3:1 to allow for landscaping <br />� viability. <br /> Page 7 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.