Laserfiche WebLink
MINUTES OF THE ORONO PLAL'lNING COMMISSION <br />MEETING HELD ON AUGUST 21 , 1995 <br />(#8 -#2046 Lakeview Golf -Continued) <br />Schroeder moved, Lindquist seconded, to recommend approval for a 4500 s .f storage <br />building, work with Staff on a screening plan, to relocate the 15th and 16th fairways with <br />the movement of fill on the property, and to update the survey at the end of the building <br />process . <br />Tom Major asked how the site was selected. The applicant said the site was in the middle <br />of3 holes, and the only good spot where there are lots of trees to block it out. Ayes 6 <br />Nays 0. <br />(#9) #2048 JAMES AND JOANN JlJNDT, 1400 BRACKETIS POINT ROAD - <br />CONDITIONAL USE PERMIT/VARIAN CE -PUBLIC HEARING -8:52-9:07 <br />P.M. <br />The Certificate of Mailing and Affidavit of Publication were noted . <br />Scott Crawford of Kraus Anderson Construction represented the applicant . <br />Mabusth noted that approval has been granted for a green house, a guest house, and a 2- <br />level caretaker residence within this property. The current application is for the <br />conditional use permit for a studio apartment within the upper level of the oversized <br />accessory structure and will act as an independent stmcture with its own kitchen and <br />entry . If sewer comes to the property, all accessory structures will be considered. The <br />sewer is likely to occur and hopefully scheduled for 1996 awaiting completion of <br />comprehensive plan amendment and Met Council approval. The property's scheduled date <br />of 1995 to update the septic will be to be refigured if sewering is not done. <br />Crawford said the construction company would like to be off-site and completed before <br />1996. <br />Peterson said he saw no problem with the studio apartment and saw the issue needing <br />resolve as sewer. Peterson is concerned with the lapse of time and the need for <br />protection, questioning whether the septic is able to handle all of the current usage. <br />Schroeder asked how many people live on the premises. Mabusth said there would be a <br />total of six bedrooms within structures. Although components of the kitchen, etc., were in <br />place according to Crawford, Mabusth said the studio apartment is a separate residential <br />unit. Mabusth further added that no floor plans were ever provided to Orono Staff of this <br />building. <br />11