My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bracketts Point Road
>
1300 Bracketts Point Road - 11-117-23-32-0017
>
Land Use
>
89-1468, CUP
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2026 10:25:51 AM
Creation date
3/24/2026 10:22:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE PLANNING COMMISSION MEETING OCTOBER 16, 1989 <br />ZONING PILE 11468-PILLSBURY CONTINUED <br />Planning Commissioner Brown questioned whether the City <br />Engineer had reviewed *_he drainage concept bring proposed? <br />Gaffron replied that the City Engineer had only conceptually <br />approved of the plan, but had not received the plans in time to <br />fully review them. <br />Planning Commissioner Bellows said 4-hat the drainage and <br />addition are really two separate issues. <br />Planning Commissioner Johnson asked w�-,ether the sketch plan <br />showed existing or proposed plantings - <br />Mr. Baldwin explained that he was going to try to preserve <br />the desireable plants on the bank and then supplement them with <br />more plantings that would help prevent erosion. <br />Chairman Kelley asked what is the hardship for the variince <br />in this case? <br />Mr. Baldwin said that it was the applicant's intention to <br />have a plant room that has the kind of sun orientation necessary. <br />In the process of constructing the addition, they will address <br />the problems with the existing _grades and drainage on the <br />property. <br />Mr. Meyer explained the scheme of the existing house in <br />relation to the need to locate the greenhouse as proposed. <br />Planning Commissioner Bellows said that she understood that <br />the greenhouse would be used for growing orchids. She said that <br />a rchid house is more sensitive than a regular greenhouse. She <br />s that the orchids need a more southeast orientation ratter <br />t.,...i south or southwest. <br />Planning Commissioner Hanson suggested that the greenhouse <br />addition be shorter so that it would not extend toward the lake <br />to the degree now prc,-sed. <br />There were no comments from the public regarding this matter <br />and the public hearing was closed. <br />Planning Commi ssionet Johnson said that he did not have a <br />problem with the hardcover, even though it is in 'he 0-75' <br />setback zone, due in part becaise slope to the lake is so <br />steep that any runoff goes directly to toes I.Ake. He questioned <br />whether a grading plan had been submitted? <br />Mr. Baldwin said that he would work with staff to establish <br />limitations for the amount of grading that the city will allow. <br />Planning Commissioner Brown noted that there would be a new <br />2 toot retaining wall. He informed Mr. Baldwin that the City is <br />sensitive of the visual aspect of retaining walls and that <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.