My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18-3998 ExC PC memo
Orono
>
Property Files
>
Street Address
>
B
>
Bracketts Point Road
>
1400 Bracketts Point Road - 11-117-23-32-0025
>
Land Use
>
18-3998, VAC
>
2-26-18 CC Meeting
>
SR
>
18-3998 ExC PC memo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2026 1:41:54 PM
Creation date
3/19/2026 1:41:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FILE #18-3998 <br />February 20, 2018 <br />Page 3 of 6 <br /> <br />District Tier <br />Tier 1 25% 31,776 (21%) 31,776 (21%) <br /> <br />Hardcover sheets have been provided as Exhibit J. The structural and hard cover <br />limitations are met with the proposed subdivision. <br /> <br />Septic System Status <br />All five lots will be served by municipal sanitary sewer. The sanitary sewer line will be <br />relocated to the middle of the peninsula, with the relocation of the road. The existing <br />main will be abandoned. <br /> <br />Vacation and Relocation of the road. The significant feature of this development <br />proposal is the relocation of the Bracketts Point Road to the center of peninsula. To <br />vacate a public right of way, the City Council must first determine that the existing right <br />of way serves no public interest. In this case, Staff supports the vacation because the <br />right of way will be relocated as illustrated in Exhibit I, preserving the public interest while <br />removing hardcover from the lake. <br /> <br />The relocation will trigger the need to relocate utilities, including the sanitary sewer trunk <br />line. The relocation of the trunk line will require the need for a second lift station serving <br />the area. For the city, this lift station is preferable to a deep trunk line and potential <br />conflicts with water table and soil stability. <br /> <br />The proposed relocation also allows for a more efficient connection with the private <br />portion of Bracketts Point Road, serving the three existing lots on the south side of the <br />peninsula. Access to all lots will be maintained, as will utility connections. The Planning <br />Commission and Council should discuss whether a public wayside is necessary to be <br />retained. The Comprehensive Plan does not identify this existing wayside as a lake access. <br /> <br />The DNR did provide comment, attached as Exhibit S. They are not opposed to the <br />vacation. <br /> <br />Analysis <br />Comprehensive Plan. The proposed use of the property is consistent with the <br />comprehensive plan, in terms of use and density. The net density is 2.54 units per acre. <br /> <br />Zoning Ordinance. The applicant approached this project with the goal of avoiding <br />variances. The lots meet the minimum width and area requirements. Each lot allows <br />sufficient area for development of an in character home without the need for setback <br />variances. <br /> <br />Average Lake Shore Setback. When developing new lakeshore lots, it is often beneficial
The URL can be used to link to this page
Your browser does not support the video tag.