My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1595 Bohns Point Road - 08-117-23-44-0024
>
Land Use
>
86-1018, CUP
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 2:34:38 PM
Creation date
3/10/2026 2:31:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a• <br />lJ <br />MINUTES OF THE PLANNING COMMISSION MEETING HELD NOVP.MBER 18, 1985. PAGE 5 <br />1990 FERRELL continued <br />Chairman Callahan noted that the application was incomplete <br />absent a survey of property containing the existing house and <br />septic site information necessary for assurance of an <br />alternate septic site if needed. <br />Mr. & Mrs. Ward Ferrell were present for this matter. Mr. <br />Ferrell stated that there should he no prcblem with an <br />auxilliary system being the lot is 3/4 acre, therefore not <br />necessary. Mr. Ferrell felt that a survey of the property <br />with existing house was also not necessar <br />Chairman Cal lahan stated that this information was necessary <br />and was requested from him last May and they would not act <br />until this information was provided. <br />Mr. Ferrell stated he had a survey dated 1958 and would submit <br />it. Assistant Zoning Administrator Gaffron stated he would <br />look at the survey and determine if it would be adequate. <br />There were ,-,o persons; present regardinq this matter at this <br />time. <br />It was moved by Chairman Callahan, seconded by Kelley, to <br />table this request pending a complete application. Motion, <br />Ayes 6, NayF 0. <br />Chairman Callahan advised applicant that they would give him <br />their general opinions regarding his request although <br />submission of the survey and sept i c site information may make <br />a difference. <br />Goetten stated she was personnally opposed to three lots. <br />Kelley, referring to his statement in the Planning <br />Commission minutes dated 4/15/85, felt that Lots 7 6 8 should <br />be combined into one lot to allow the existing home and one <br />other lot. <br />Taylor and ;":.Donald agr^ed with Kelley's opinion. <br />Rovegno and Callahan felt that two lots with dwellings would <br />probably be reasonable with the rope septic site testing, <br />three lots would be setting p•ecedent. <br />0991 M-LLIAM ULRICH <br />1535 FOHN'5 POINT ROAD <br />CON^'.TIONAL USE PERMIT <br />PUBLIC HEARING 1:40 - 10:37 <br />Chairman Callahan explained the after -the -fact application <br />for A co►.ditional use permit and variance to do grading and <br />filling within 75' of lakeshore. <br />
The URL can be used to link to this page
Your browser does not support the video tag.