My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-30-1987 Council Packet
Orono
>
City Council
>
1987
>
03-30-1987 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 12:57:44 PM
Creation date
2/23/2026 12:54:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO PLANNING COMMISSION MEETING - PUBLIC HEARING <br />HIGHWAY 12 CORRIDOR STUDY/COMPREHRNSIVE PLAN AMENDMENT <br />Mr. Pflaum explained Mr. Rebers proposes residential for the <br />northern 2/3 of the site. He believes that this area should be sewered <br />and that it have a higher density than the 2-acre minimum because the sewer <br />and water units are available either through Orono or Long Lake. The <br />property will have to bear a significant portion o` the corridor <br />development costs. The 2-acre on -site septic requirements :e not economical <br />type of combination usage. <br />Larry Hanson explained that Mr. Rebers would like to develop the <br />northern portion into 1-acre sites because of the concern of on -site sewage <br />treatment. A few of the sites have been tested and found to have perched <br />water, thus presuming a potential for problems. The following calculations <br />have been made regarding the amount of tree. removal under the two <br />scenarios. <br />(These calculations include house pad and roadways.) <br />2-acre lots - using primary septic system: 15% tree removal <br />using alternative system: almost double <br />1-acre lots - sewered 12% tree removal <br />To add sewer/water/streets to the area for 2-acre lots - $360,000 <br />$24,000 per unit (based on 15 units) <br />Mr. Hanson noted, because of the 2-acre lots to the north of this <br />property, the southern portion of the residential area could be 1-acre lots <br />and the most northern portion of M:,. Rebers lots could be 2-acre lots. <br />With all 2-acre lots, there would be 15 lots. With all 1-acre lots, 25 <br />lots, and with the combination of 1-acre/2--acre lots, 21 lots total. <br />Mr. Rebers noted he is willing to assume the host of putting in <br />sewer and water. He noted ',ecanse .i the soil testing results, sewer is <br />the only way to develop this prope.ty. <br />City Administrator Bernhardson noted that the possibility does <br />exist for the commerical part of the property to be served by a Long Lake <br />local line, not tied into until Pipe E. <br />Bellows asked if there would be any known variances required for <br />the residential area development. <br />Building i Zoning Administrator Mabusth noted that the area had <br />not been looked at for B-1 zoning yet. <br />Chairman Kelley asked with this type of development for the <br />residential area, how would this affect the run-off of water from a piece <br />of property and how does it affect the pond in the lower right carrier. <br />Mr. Hanson explained that props-r flood control and water quality <br />devlces wi l 1 be on the site. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.