My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4344
Orono
>
Resolutions
>
Reso 0001-7499
>
Reso 4300 - 4399 (May 24, 1999 - December 13, 1999)
>
Resolution 4344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 8:17:12 AM
Creation date
11/17/2015 1:21:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> ,s <br /> /'� <br /> � O� . <br /> i � 0 � <br /> �,. - CITY of ORONO <br /> � � <br /> � G'� RESOLUTION OF THE CITY COUNCIL <br /> �9kESH04��' NO. � � � � <br /> 5. All lots sha11 have direct access to Tonkawa Road(County Road No. 135). <br /> 6. All existing hardcover will be remo�-ed by the subdividers upon completion of the <br /> final plat. <br /> 7. Setbacks for structures is 35' front yazd and 10' side yard. <br /> 8. The draft version of the City's Comprehensive Stormwater Management Plan shows <br /> that the site lies within the Stubbs Ba�drainage district. The site drains to the south <br /> and the north from the high point on Lot 2. All flows ultimately reach North Arm.� <br /> The bluff area along the lake and the existing topography of the site will make <br /> ponding difficult. <br /> 9. A vegetated buffer strip along the top of the bluff is necessary to provide water <br /> • quality benefi�s to Lake Minnetonka <br /> 10. Hennepin County shall grant access pemuts for access to Tonkawa Road. <br /> � 11. The property was assessed for 3 units in 1976 as part of the 73-1 sewer project. <br /> Sanitary sewer to serve Lots 1 and 2 should be provided sanitary service from <br /> Tonkawa Road. The existing sewer on Tonkawa Road east of Lot 1 should be <br /> extended southerly appro�cimately 1 QO-200 feet to serve Lot 2. Sewer connection for <br /> Lot 3 is located over the southwestern portion of the property. <br /> 12. A bluff spans the entire lakeshore of the properry. Structures aze required to meet a <br /> 30'top of bluff setback. This setback has the greatest impact on proposed Lot 3. <br /> 13. Any alteration within the bluff imgact zone shown on the preliminary plat shall <br /> require further Planning Commission and City Council review. <br /> 14. The Planning Commission reviev�ed the application on August 16, 1999 and <br /> recommended approval by a vote of 6 to 0 to approve the three lot subdivision. <br /> � NOW, THEREFORE, BE IT RESOLVED, that based upon one or more of th�e <br /> findings noted above,the City Council of the City of Orono hereby approves the preliminary plat for <br /> • Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.