My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1980-06-16 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road North
>
793 Ferndale Road North - 36-118-23-12-0016
>
Septic
>
1980-06-16 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 3:31:00 PM
Creation date
2/12/2026 3:10:34 PM
Metadata
Fields
Template:
x Address Old
House Number
793
Street Name
Ferndale
Street Type
Road
Street Direction
North
Address
793 Ferndale Road North
PIN
3611823120016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE EVe�LUATICN REPORT <br />JOHN L. BROOKS PROPERTY <br />795 N. FERNDALF HOAR, ORONO <br />6-lo-bo <br />1 <br />d <br />rK . -000*0' <br />On Junes 8, 1980 one proposed lot was tested for the suithbility <br />of supportinv a drainfield system. Six percolation holes were tested <br />and 3 soil borings taken on the proposed lot. Percolation holes were <br />dug b inches in diameter to a 42 inch depth while the soil borings <br />were dug 6 inches in diameter to a 4 foot depth and 3 inches in dia- <br />meter to the remaining depth. The percolation holes were dug by both <br />hand and power augers while the soil borings were dug by bucket type <br />hand augers. <br />This proposed lot is located in the Hayden Loam soil series which <br />is generally moderately permeable. The primary site yieldod a fairly <br />fast percolation rate of 13.0 minutes per inch and the water table is <br />deep enough to meet the requirements for a standard drainfield system. <br />Holes 5 and 6 were closer to the drainge swale on the property leading <br />to the lake and contained more clay soils. This resulted in a slower <br />percolation rate and the water table was higher. A shallow trench sys- <br />tem should be used if ever needed on this alternate site and the trenc- <br />hes should be kept from holes 5-6 as touch as possible. <br />Additional design information will be needed once the size and <br />location of a proposed house are known. It would be possible to locate <br />the alternate site up the hill more in better soil depending on where <br />the house is located. Please contact me at that time, or if i <br />questions come up. <br />Sincerely, <br />PERC OR , INC. <br />Mark S . Gront <br />
The URL can be used to link to this page
Your browser does not support the video tag.