My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-07-20 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road North
>
763 Ferndale Road North - 36-118-23-11-0026
>
Septic
>
1996-07-20 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 2:07:47 PM
Creation date
2/11/2026 2:00:11 PM
Metadata
Fields
Template:
x Address Old
House Number
763
Street Name
Ferndale
Street Type
Road
Street Direction
North
Address
763 Ferndale Road North
PIN
3611823110023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The existing tanks may be used upon approval by the local Inspector. The tanks must <br />be water tight. Surface run off flows over the tanks and must be diverted away from the <br />tanks to prevent surface water from seeping into the tanks. <br />Keep all heavy equipment off of the proposed treatment area before and after <br />construction. The treatment area should be marked off before construction. This <br />Design is not valid & the system will need to be relocated if failure to protect the areas <br />proposed for On -Site Sewage Treatment occurs. <br />With proper installation and maintenance, this system should have no problem in <br />treating septic effluent effectively. <br />Nothing other than gray water (laundry, showers, etc.) should be disposed of into the <br />septic tanks. Garbage disposals are not recommended, due to adding more solids & <br />fine solids passing through to the system. Excessive amounts of soaps, cleaning agents <br />& chlorine agents may kill the bacteria needed to treat septic effluent. Additives are not <br />recommended. Recommend to pump & clean your tanks through the manhole by a <br />certified pumper every 2 years. Check with your pumper to set up a schedule. <br />even 9chirmers <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.