My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
650 Big Island - 22-117-23-31-0035
>
Land Use
>
09-3425, CUP
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2026 2:56:57 PM
Creation date
1/29/2026 2:55:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday,January18,2010 <br />66:30 o'clock p.m. <br />Council <br />Exhibit D <br />5. #09-3425 JAMES JOHNSON, 650 BIG ISLAND, AFTER-THE-FACT VARIANCE AND <br />CONDITIONAL USE PERMIT, 6:38 P.M. -6:45 P.M. <br />The Applicant was not present. <br />Curtis stated the applicant is requesting an after-the-fact hardcover variance and an after-the-fact <br />conditional use permit for retaining walls and a patio within the 0-75 f zone to remain as constructed. <br />The request includes a hardcover variance to allow the hardcover associated with the retaining walls to <br />remain when only 333 square feet of hardcover is allowed for lake access stairs within the 0-75 foot <br />zone. <br />. . <br />The applicant's property has a steep lakeshore, with the top of the slope about 22Jeet above the lake. In <br />2008, the applicant hired two separate contractors to replace a failing sea wall with rip-rap, a walkway <br />deck with a smaller patio walkway and lake access stairs. A permit for the rip-rap was obtained from the <br />MCWD. Neither the contractor nor the applicant realized that City approvals were required as it was a <br />replacement. <br />Staff discovered the new walls on the annual shoreline inspection boat trip. The applicant was out of the <br />state for a number of months and was unable tp be reached. Once the property owner was contacted, the <br />wall contractor began to work with staff to submitaµ after-the-fact application. Following an initial <br />meeting with staff and the City Engineer, the co~tra#9r stopped returning phone calls from staff and the <br />property owner. At this time the property owner has stibmitte4 the necessary information with the <br />exception of an engineered construction plan for th~ retajning wa11. Engineered plans are required for <br />walls four feet in height or above which retain soil: Jhe\valls have a section that just exceeds the four <br />foot limitation. · <br />The City Engineer has reviewed the survey, the contractor's sketch, and feels that generally the walls are <br />necessary to maintain the slope. It appears that the patiqwalkway and walls are a nearly in-kind <br />replacement for the previously existing deck and seawalls. One recommendation option for after-the-fact <br />reviews sucn.a.s this.is forequire the walls, patios, decking, etc., to be removed. In this situation, removal <br />of the walJs and walk'way t§ I't)Store a vegetated slope down to the water would result in a lot of earth <br />movement and larger area ofopen, un-vegetated ground. It appears that with the walls in place the slope <br />is stable.·Re.storation and re-gpi~ing the slope would open up the potential to create an erosion problem. <br />Staff would ~~cql):ll)J.end that the .\Valls be allowed to remain. However, the Planning Commission should <br />discuss the size ci{t~~ patio walt'way which replaced the existing deck. The property owner has planted <br />native grasses to helpt<:> screenthe walls from the lake. <br />',< <br /><<~~ <br />Planning Staff recommends approval of the CUP for the retaining walls and a variance for hardcover at a <br />level the Planning Commission deems appropriate. <br />An after-the-fact permit for grading and retaining walls is required to be obtained following any <br />approvals. The applicant should be required to submit an engineer's opinion on the wall construction for <br />the building permit. The evaluation likely cannot occur until the ground thaws. Additional vegetative <br />screening should be provided to help to hide the walls when viewed from the lake. <br />Page 2 --~-----~----·--------·--
The URL can be used to link to this page
Your browser does not support the video tag.