My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
540 Big Island - 22-117-23-42-0001
>
Land Use
>
17-3980, VAR
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2026 2:21:17 PM
Creation date
1/22/2026 2:19:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: Melanie Curtis <br />Roger Peitso <br />From : Shawn & Kelly Wischmeier <br />Re: 540 Big Island Garage Variance <br />Date: October 9, 2017 <br />My goal is to better communicate the actions we have taken thus far on the 540 Big Island project. We <br />had zero intent of frustrating either of you or the City of Orono in any way. I must first apologize for the <br />poor communication on my end. I put everything on Dan Murphy of our builder (KDB) to handle as it <br />relates to the variance process when I should have been more involved from the start. I have also had a <br />period of heavy travel at work, which unfortunately took my attention away. I should have asked Kelly <br />to be more involved in my absence . <br />Here are some background points on my view/intent of what has happened thus far. Following these <br />points are a number of pictures that help illustrate one or more concept as discussed. <br />1) I believe that KDB was acting in good faith when they chose the placement of the garage as they <br />were simply trying to keep the construction on the island as compact and hidden from the <br />shoreline as possible. This is consistent with the same approach Kelly and I have taken to keep <br />this project as discreet and hidden as possible. We are also working to make sure that whatever <br />is viewable from the water will look as natural as possible (e.g., we place the chimney in such a <br />way that it is about the only thing visible in the opening through the trees from the water so as <br />to allow the more natural stone to be seen as opposed to siding). That said, despite the best of <br />intentions all around, KDB recognizes that the foundation was placed too close and thus filed <br />the variance on behalf of Kelly and myself. <br />2) KDB realized that the foundation was poured too close to the main structure ("cabin") some <br />weeks ago. They communicated this to us so we were certainly aware that they needed to work <br />through a variance process with the City of Orono. Not at all trying to pretend that we were <br />unaware of the need to work through a variance process. <br />3) Challenges we run into by building on the island are many, as I'm sure you can appreciate. We <br />have to barge everything out, rarely have exactly what we need, have trouble finding the right <br />labor/skills from time to time, sometimes need heavy equipment which may or may not be <br />available, etc. We completely realize these are our problems, not yours, but wanted to note <br />that all of these considerations have weighed into the actions we have taken thus far. <br />4) Given the long-range planning that we required to source, procure, transport materials to the <br />island, and line up the labor to start building this garage, it would have been very difficult and <br />costly for us to stop our progress in moving forward. There were a number of sunk expenses, <br />especially on the labor side that could not be recouped at a future date . Materials were ordered <br />and in the process of being delivered . <br />5) Additionally, given the timing of the variance process coming to completion in mid to late <br />November, which would also put us at a point that the large equipment we need to safely build <br />ECEIVED <br />OCT O 8 2.0i7 <br />C\TY OF ORONO
The URL can be used to link to this page
Your browser does not support the video tag.