Laserfiche WebLink
The existing tanks may be used upon approval by the city Inspector. The tanks must be <br />water tight. <br />Keep all heavy equipment off of the proposed treatment area before and after <br />construction. The treatment area should be marked off before construction. This <br />Design is not valid & the system will need to be relocated if failure to protect the areas <br />proposed for On -Site Sewage Treatment occurs. <br />With proper installation and maintenance, this system should have no problem in <br />treating septic effluent effectively. <br />Nothing other than gray water (laundry, showers, etc.) should be disposed of into the <br />septic tanks. Garbage disposals are not recommended, due to adding more solids & <br />fine solids passing through to the system. Excessive amounts of soaps, cleaning agents <br />& chlorine agents may kill the bacteria needed to treat septic effluent. Additives are not <br />recommended. Recommend to pump & clean y our tanks through the manhole by a <br />certified pumper every 2 years. Check with your pumper to set up a schedule. <br />Steven B. c}�irmers �� <br />E <br />