Laserfiche WebLink
�� <br /> /� �1V' <br /> • � � . <br /> ��b. - CITY of ORONO <br /> � � <br /> �� �,'� " RESOLUTION OF THE CITY COUNCIL � <br /> � ���ESH�4�' NO. 4 c5 � � � <br /> . Each lot will be serviced with sewer and water. Sewer and water assessments were <br /> paid based on the width of the lot at the time the sewer and water projects were � <br /> completed in this neighborhood. <br /> 5. . An additional assessment is due for the 1999 Navarre water treatment plant <br /> rehabilitation project. The total assessment due based on the 2000 fee schedule is <br /> $360 for the new lot(Lot 2). <br /> � 6. A driveway access is currently provided by an opening from Togo Road for Lot 1. <br /> A new driveway access will be needed for Lot 2 from� Togo Road. The Public <br /> Services Director shall approve a driveway cut for Lot 2 prior to the issuance of a <br /> building permit. . <br /> 6. An accessory building is located on proposed Lot 2 and would remain on the property <br /> ' following recording of the subdivision. The subdivider has agreed that the structure <br /> remain on the property allowing one year from final plat approval to obtain a . . <br /> • � building permit for a residence. � . <br /> 7. Subdivider has agreed to dedicate additional land for public right-of-way 15'from the . <br /> centerline of Togo Road. <br /> 8. Standard drainage and utility easements would be dedicated on the final plat 5'along <br /> interior property lines and 10' along exterior property lines. <br /> NOW, THEREFORE BE IT RESOLVED, that based upon one or more of the <br /> findings noted above,the City Council of the City of Orono hereby approves the preliminary plat for <br /> James Barth per preliminary plat drawings by Robert Rohlin, Land Surveyor, Meyer-Rohlin, Inc. <br /> . � Engineers-Land Surveyors dated 9/18/00,revised 10-18-2000,subject to the following conditions: <br /> l. � Subdivider shall pay the standard Park Dedication Fee per City ordinance for one ' <br /> additional building lot. <br /> 2. Subdivider shall pay one additional assessment fo�the 1999 Navarre water treatment <br /> plant rehabilitation proj ect. The total assessment due based on the 2000 fee schedule <br /> is $360. � . <br /> • Page 2 of 4 <br />