My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-10-1986 Council Packet
Orono
>
City Council
>
1986
>
11-10-1986 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2026 2:34:00 PM
Creation date
1/20/2026 2:22:46 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning Files #1062 & #1077 <br />November 5, 1986 <br />Page 5 <br />J. Sprinkler System <br />Per Appendix E, the structure will be required to have a <br />sprinkler system. Applicant must provide an alternate water <br />supply per N.F.P.A. 13 standards. <br />The following specifications have been provided: <br />40 HP 460 Volts <br />3 Phase 500 G.P.M. <br />3500 R.P.M., 7 'Y" to 8" Casing <br />Staff has confirmed that the above specifications will <br />easily satisfy minimum flow requirement of 500 G.P.M. <br />K. SAC Units <br />Parameter: 14 Students = 1 SAC <br />67 Students/14 = 4.78 or 5 SAC Units <br />SAC units to be paid with building permit. <br />5 SAC Units x $475.00 = $2,375.00 <br />Staff recommendation to recommend approval of application <br />#1062 per Planning Commission recommendation as follows: <br />To recommend approval of the variances and conditional use <br />permit application and final site plans submitted by <br />Ingeborg Cici for a nursery school/day care center referred <br />to as Busy Beaver Day Care per plans dated 9/10/86 by <br />Pandeli Cici (consisting of Site Grading Plan, Floor Plan, <br />Elevations, and Tandscape Plan) and per survey by John V. <br />Chaffee dated 9/11/86 submitted since the Planning <br />Commission review, subject to the following conditions: <br />1. Parking area for day care use must be relocated so <br />that a 50' setback is maintained from newly defined <br />right-of-way line. <br />2. Applicant to enter into a Developer's Agrecment and <br />post appropriate security to assure that the road, left <br />turn lane, landscaping and erosion control plan are <br />completed per approved plans. <br />3. State Highway Department access permit, quit claim <br />deed of 30 feet right-of-way, MCWD permit must be <br />submitted to City prior to issuance of building permit. <br />4. Per MCAR § 7.012 - Working plan drawings and <br />specifications for this project must be drawn by an <br />architect licensed by the State of Minnesota. <br />The attach%Ci resolution has been drafted per Planning <br />Commission recommendation and additional information submitted <br />since the Planning Commission's review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.