My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-10-1986 Council Packet
Orono
>
City Council
>
1986
>
11-10-1986 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2026 2:34:00 PM
Creation date
1/20/2026 2:22:46 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,,. ;ngineering feasibility study to determine exact <br />location and a more accurate estimate of costs ($1,000) <br />B. Determination of costs in t.nancing for an <br />assessment <br />C. A 100% petition request from the property owners <br />effected <br />Ncyatiation and receipt of land for construction <br />of alternate access <br />E. Project assessment hearing <br />F. Award of bid <br />- G. Co )str uct ion <br />H. Completion of project <br />1. Assessment <br />RECOMMENDATION - Based on the preliminary review a..J if the <br />owners' interest is such that they are willing to pay for the <br />entire project, it is staffs recommendation that fear bility <br />study be undertaken to more accurately determine location and <br />costs. <br />PROPOSED MOTION - Moved by _, s-conde_. by _, to direct City <br />Engineer to undertake feasibility st.ly on the project once staf&Z <br />is in rec pt of a preliminary 100% petition from the neignhor-e <br />oi. Oroi..; Lane regarding undertaking of the project indicating <br />thei- wil.lingress to bear the project costs at the present <br />estimated leve'. Ayes _, Nays <br />cc: Newell weed <br />Glenn Cook, City Engineer <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.