Laserfiche WebLink
ws� <br />September 8, 1986 <br />City of Orono <br />Orono, MN <br />Attention: Mayo- Butler <br />Mr. Mark E. Bernhardson, City Administrator <br />Orono Council Members <br />Ladies and Gentlemen: <br />This is to notify you of Washington Scientific's status and plans regarding <br />the installation of a sprinkler system at the main facility located at 2605 <br />West Wayzata Boulevard. <br />A. Status. <br />Our Board of Directors met on August 27, 1986, and approved the capital <br />plan for fiscal 1987. Subsequently, a capital retest for the funds to <br />install the sprinkler system was initiated and approved by the top manage- <br />ment, including Mr. Bill Lucke, Vice President, and Mr. Cliff Dinsmore, <br />President. The approval was finalized on September 3, 1986. <br />B. Plans. <br />Our Engineering Department has initiated the necessary steps to install <br />the sprinkler system. <br />1. A plumbing contractor has been selected to quote on installing the <br />water mains. <br />2. The sprinkler contractor visited the facility to finalize his quote. <br />3. Our insurance broker is in the process of finalizing the specifications. <br />At this time we are confident that the installation will be completed by <br />January 1, 1987. <br />I trust that this confirms Washington Scientific's commitment to provide sprinkler <br />protection for the main facility. <br />Sincerely, <br />WAS <br />INGTON SCI 99TIFIC INDUSTRIES <br />w <br />Ane <br />ganaMa r ng Engineering <br />cc: C. Dinsmore, President <br />B. Luck., Vice President <br />WASHINGTON SCItNTIRIC 1lIOYSTRMS, MC. <br />load lM* M-'ww0b ISM 0 MOM 61b4n »►t • rM 9104ftS Q <br />