Laserfiche WebLink
R2COMMIMATIONS t <br />We recommend a mound system for your site and we have attached <br />design calculations, a bill of materials and a site plan sketch <br />of the system. The details of the system layout are as follows: <br />Protection - Care must be taken to avoid driving on the <br />mound area. You should rope off the mound area to prevent <br />construction traffic from traveling over and compacting the <br />soil which will make the site unusable for a disposal <br />system. <br />Piping - A 2" pipe from the pump to the center or end of the <br />mound will connect to a 2" manifold pipe as shown in <br />attached detail E12 or E15 and shall be frost proofed as <br />shown in detail F17 where less than 4 feet of cover is <br />provided. This pipe shall be the first thing installed. <br />Preparation - With a tractor backhoe sitting outside the <br />mound area, the surface of the mounk' area shall be broken up <br />using the teeth of the bucket. <br />Washed sand - Deliver truck loads of washed sand outside of <br />the mound area leaving the mound area roped off durinq sand <br />delivery. The quantity of washed sand required is listed in <br />the bill of materials. Use a track mounted tractor with <br />bucket to lay a one foot layer of sand minimum in front of <br />the tractor to act as a cushion for the tractor to ride on <br />while spreading the sand over the mound area. The completed <br />top of the sand shall be level and shall be the minimum sa•-:d <br />layer thickness specified on the design sheet. Outside the <br />rock bed area, slope the sand downward at a 4 horizontal to <br />1 vertical slope from the top of the rock bed to the <br />existing surface. <br />Rock bed - The dimensions of the rock bed are listed on the <br />design sheet and the number of tons of rock are listed in <br />the bill of materials. The clean, 3/4" to 2 1/2" rock shall <br />be placed atop the level sand surface. Do not drive on the <br />sand to deliver the rock. One way of delivering rock is <br />with a "ready -mix" truck with a long enough chute but the <br />truck must be thoroughly cleaned before loading rock so that <br />no cement remains. <br />Piping - When 8 inches of rock is in place, connect the manifold <br />to the existing pump line and assemble laterals as shown in <br />details E12 or E15 and E14 on *op of the rock. The size, lengths <br />and numbers of these laterals and perforation size and spacing <br />are shown in the attached design and bill of material sheets. <br />Then complete the rock placetr:nt with the remaining 4 inches of <br />rock. <br />