My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-22-1986 Council Packet
Orono
>
City Council
>
1986
>
09-22-1986 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2026 2:06:15 PM
Creation date
1/12/2026 1:58:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
!8 <br />NMI 000ING <br />TO: Mayor and City Council S EP 2 % 1986 <br />FROK: Mark Bernhardson, City Administratolt i <br />� V11-Y OF N630 <br />DATE: September 18, 1986 <br />SUBJECT: Request For Consultant Analysis - Facilities Assessment <br />At the September 17th Budget Meeting, the request was made for up <br />to $8,000 being spent with City's Engineer regarding assistance <br />for the items listed in the attached memo. Following discussion, <br />no action was taken. <br />It is requested that the Council consider thf, item at its <br />September 22nd, 1986 meeting. Any further questions or comrients, <br />please feel free to contact me. <br />PRUPUSED MU'ZIUN - Moved by , seconded by , to authorize staff <br />to engage the consulting engineer to spend up to $8,000 in <br />analyzing current buildings regarding structural ability, <br />rehabilitation and code cc=,::,pliance together with a program <br />analysis process of space needs based on existing needs and <br />projected future needs. Ayes _, Nays _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.